Question

5) Coolant circulation pump X for continuous operation in a nuclear power station has MTBF = 2 yrs. and MTTR = 10 hrs. A standby older pump Y with the same capacity is also used with MTBF = 22 mo. and...

5) Coolant circulation pump X for continuous operation in a nuclear power station has MTBF = 2 yrs. and MTTR = 10 hrs. A standby older pump Y with the same capacity is also used with MTBF = 22 mo. and MTTR = 15 hrs. Perfect switching between pumps A and B of the plant is assumed.

(i) Draw the detailed Markov process graph of the cooling pump system and determine the limiting (steady-state) probability of all states that it is possible to find the system in.

(ii) What is the availability of the nuclear station’s pumping system?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solulion Compomern aio 9/v va ol to f.rsi ad coolon Ciculaon pump Hu Se con AsSume Passibie tates Heve, three oes are Possi.30, 8I -3D R Cica OY DiOS Since s gyeale1 han ulated Value o t calu CrPlical value 4hen reecl Aa no P- valu - yPothess Hen c

Add a comment
Know the answer?
Add Answer to:
5) Coolant circulation pump X for continuous operation in a nuclear power station has MTBF = 2 yrs. and MTTR = 10 hrs. A standby older pump Y with the same capacity is also used with MTBF = 22 mo. and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT