Assume that 5 kW air conditioner would run 80 % of the time (80% duty cycle) during the peak hour and might be limited by utility remote control to a duty cycle of 65%. Determine the following: i) The...

Assume that 5 kW air conditioner would run 80 % of the time (80% duty cycle) during the peak hour and might be limited by utility remote control to a duty cycle of 65%. Determine the following:

i) The of minutes of operation denied at the end 1 hour of control of the unit.

ii) The amount of reduced energy consumption during the peak hour if such control is applied simultaneously to 100 000 air conditioners throughout the system.

iii) The total amount of reduced energy consumption during the peak.

iv) The total amount of additional reduction in energy consumption in part (iii) if the transformer and distribution losses at peak load is 8%.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

und aD Ic

Add a comment
Know the answer?
Add Answer to:
Assume that 5 kW air conditioner would run 80 % of the time (80% duty cycle) during the peak hour and might be limited by utility remote control to a duty cycle of 65%. Determine the following: i) The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Assume that 5 kW air conditioner would run 80 % of the time (80% duty cycle)...

    Assume that 5 kW air conditioner would run 80 % of the time (80% duty cycle) during the peak hour and might be limited by utility remote control to a duty cycle of 65%. Determine the following: i) The of minutes of operation denied at the end 1 hour of control of the unit. ii) The amount of reduced energy consumption during the peak hour if such control is applied simultaneously to 100 000 air conditioners throughout the system. iii)...

  • 2.14 Repeat Example 2.12, assuming that there are eight houses connected on each DT and that there are a tot...

    2.14 Repeat Example 2.12, assuming that there are eight houses connected on each DT and that there are a total of 120 DTs and 960 residences supplied by the primary feeder Example 2.15 Assume that a 5 kW air conditioner would run 80 % of the time (80% duty cycle) and, during the peak hour, might be limited by utility remote control to a duty cycle of 65%. Determine the following a. The number of minutes of operation denied at...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT