Formula to calculate variable factory overhead controllable variance | ||||||
Variable factory overhead controllable variance | Actual variable factory overhead - Budgeted variable factory overhead | |||||
Variable factory overhead controllable variance | 113,350-(3000*6.5*5.60) | |||||
Variable factory overhead controllable variance | 113,350-109,200 | |||||
Variable factory overhead controllable variance | $4,150 | |||||
The actual variable factory overhead is higher than budgeted variable factory overhead and thus the variance is unfavorable. | ||||||
Variable factory overhead controllable variance | $4,150 | unfavorable | ||||
Factory Overhead Controllable Variance Bellingham Company produced 3,000 units of product that required 6.5 sta...
1. Factory Overhead Controllable Variance Bellingham Company produced 5,400 units of product that required 5.5 standard direct labor hours per unit. The standard variable overhead cost per unit is $6.00 per direct labor hour. The actual variable factory overhead was $170,360. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. 2. Factory Overhead Volume Variance Bellingham Company produced 5,100 units of product...
Factory Overhead Controllable Variance Bellingham Company produced 3,100 units of product that required 6 standard direct labor hours per unit. The standard variable overhead cost per unit is $5.40 per direct labor hour. The actual variable factory overhead was $104,360. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Favorable
Factory Overhead Controllable Variance Bellingham Company produced 4,100 units of product that required 4.5 standard hours per unit. The standard variable overhead cost per unit is $3.80 per hour. The actual variable factory overhead was $67,450. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. $
Bellingham Company produced 6,900 units of product that required 6.5 standard hours per unit. The standard variable overhead cost per unit is $5.90 per hour. The actual variable factory overhead was $260,645. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. 23-2 Practice Exercises Factory Overhead Controllable Variance Bellingham Company produced 6,900 units of product that required 6.5 standard hours per unit....
Factory Overhead Volume Variance Bellingham Company produced 3,600 units of product that required 6 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.50 per direct labor hour at 19,900 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Favorable
Factory Overhead Volume Variance Bellingham Company produced 2,100 units of product that required 1.5 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.70 per direct labor hour at 2,950 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number
Show Me How Calculator Factory Overhead Volume Variance Bellingham Company produced 5,000 units of product that required 5.5 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.95 per direct labor hour at 25,600 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Favorable
Bellingham Company produced 2,300 units of product that required 2 standard hours per unit. The standard variable overhead cost per unit is $4.80 per hour. The actual variable factory overhead was $21,550. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. $
Bellingham Company produced 2,300 units of product that required 2 standard hours per unit. The standard variable overhead cost per unit is $4.80 per hour. The actual variable factory overhead was $21,550. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. $
Direct Materials Variances Bellingham Company produces a product that requires 6 standard pounds per unit. The standard price is $10 per pound. If 6,300 units required 36,300 pounds, which were purchased at $10.3 per pound, what is the direct materials (a) price variance, (b) quantity variance, and (c) total direct materials cost variance? Enter a favorable variance as negative number using a minus sign and an unfavorable variance as a positive number. 10,890 Unfavorable a. Direct materials price variance b....