Question

8) Duck Construction has proposed two alternatives for constructing a new bridge in Orego Based on data from recent bridge co
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Alternotive Constructhon and design cots 2 m Annual maintenance o16 m MARR Sto year L ife 〖ene eren F6 mn Annual Now of AlterPw of annue cost t Cot S66 Ec of A1fevnctiv 2 0 1 P/A,147,) So 32 3. 293 2 pr of Art. 1 Eauvalent unifM Cash plow far Ait, 1NPn of At.2 for Ait.2 132 As pex Pn method/ analyi Aiternative 2 Fo e chosen over 1 i s greater than 1 rr _ ( ra tio EUCF ana

Add a comment
Know the answer?
Add Answer to:
8) Duck Construction has proposed two alternatives for constructing a new bridge in Orego Based on data from recent...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3. Two advanced thermal insulating and anti-condensation protection alternatives have been proposed for new Antarctica marine...

    3. Two advanced thermal insulating and anti-condensation protection alternatives have been proposed for new Antarctica marine vessels subicct to the harsh marine environment. One alternative must be selected. Estimated savings from reduced total installation and maintenance costs over conventional insulation are the following: Alternative Installed cost Annual savings Life, years Alpha-B $15,000 $6250 Delta-T $13,000 $4750 8 Which alternative should be recommended based on the present worth method? Use a MARR of 18% and a study period of 8 years....

  • 3. Two advanced thermal insulating and anti-condensation protection alternatives have been proposed for new Antarctica marine...

    3. Two advanced thermal insulating and anti-condensation protection alternatives have been proposed for new Antarctica marine vessels subject to the harsh marine environment. One alternative must be selected. Estimated savings from reduced total installation and maintenance costs over conventional insulation are the following: Alternative Installed cost Annual savings Life, years Delta-T Alpha-B $15,000 $6250 $13,000 $4750 8 8 Which alternative should be recommended based on the present worth method? Use a MARR of 18% and a study period of 8...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT