The answer has been presented in the supporting sheet. All the parts has been solved with detailed explanation and format. For detailed answer refer to the supporting sheet.
O chapter 10 Homor CengageNow21 Onne teach com/n/takeAssignment/takelssignmentMan dohevoker-&akeAssignmentSessi...
Stillwater Designs rebuilds defective units of its S12L7 Kicker speaker model. During the year, Stillwater rebuilt 15,000 units. Materials and labor standards for performing the repairs are as follows: Direct materials (1 recon kit @ $160) $160.00 Direct materials (1 cabinet @ $55) 55.00 Direct labor (5 hrs. @ $15) 75.00 Required: 1. Compute the standard hours allowed for a volume of 15,000 rebuilt units. hours 2. Compute the standard number of kits and cabinets allowed for a volume of...
Standard Quantities of Labor and Materials Stillwater Designs rebuilds defective units of its S12L7 Kicker speaker model. During the year, Stillwater rebuilt 8,500 units. Materials and labor standards for performing the repairs are as follows: Direct materials (1 recon kit @ $140) $140 Direct materials (1 cabinet @ $30) Direct labor (3 hrs. @ $12) Required: 1. Compute the standard hours allowed for a volume of 8,500 rebuilt units. hours 2. Compute the standard number of kits and cabinets allowed...
I AM LOST THIS CHAPTER PLEASE HELP ASAP Lane Company manufactures a single product and applies overhead cost to that product using standard direct labor-hours. The budgeted variable manufacturing overhead is $4.20 per direct labor-hour and the budgeted fixed manufacturing overhead is $1,599,000 per year. The standard quantity of materials is 4 pounds per unit and the standard cost is $8.50 per pound. The standard direct labor-hours per unit is 1.5 hours and the standard labor rate is $13.10 per...