20-ft thick fill is planned to be placed at a construction site. Ground settlement is of concern due to high compressibility of the clay layer. A consolidation test was performed on a sample collected from the center of the 15-ft thick clay layer. On the following page, e-logp curve obtained from the test is included. Estimate ground settlement based on the information provided. Hint: Dont forget to correct the curve for field conditions. Ifơ0 is within 10% of σ, assume soil to be normally consolidated. 20-ft-thick fill, Y: = 120 pcf 5 ft Sand, y 115 pcf 15 ft Clay, n 112 pcf; cv 0.05 ft?/day, eo 1.295 Sanpf Legend ▼ Groundwater table
1.3 1.2 1.1 1.0UL 0.9 0.8 0.7 0.6 0.5 0.4 10 100 1000 10000 100000 Vertical Stress, psf
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Show all work 20-ft thick fill is planned to be placed at a construction site. Ground settlement is of concern due...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 6. (former exam question) A large granular free draining fill 6-ft thick was placed on a...

    6. (former exam question) A large granular free draining fill 6-ft thick was placed on a 15-ft thick layer of clay as shown in the figure below. A piezometer was installed at the midpoint of the clay layer. The water table is at the original ground surface. Three years after the placement of the fill, the piezometer reads 7.63 ft above the ground water level. Answer the following questions: a. What percentage of the total consolidation for the entire clay...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The watertable is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m and a saturated unit weight of 18 kN/m3. The capillary rise in sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m 1. One...

  • For the soil profile shown below, calculate the final settlement due to the placement of the...

    For the soil profile shown below, calculate the final settlement due to the placement of the sand fill. Estimate the excess pore pressure at a depth of 1.5 m into the third clay layer 1.5 years after the fill is placed. Assume the coefficient of consolidation is Cv = 1.8 m2/yr. Fill y = 16.0 kN/m² (3m thick) Clay 1 (3m thick) Sand (0.5m thick) Clay 2 (2m thick) Sand (0.5m thick) Clay 3 (4m thick) Sand (0.5m thick) eo...

  • 2) You are given the soil deposit shown below. Assume c,-0.1 ftiday and c0.1 ftday. You...

    2) You are given the soil deposit shown below. Assume c,-0.1 ftiday and c0.1 ftday. You have previously calculated that the total ultimate settlement of the clay layer will be 131 ft and it will take 1,908 days to achieve an average degrec of consolidation of 90%. Consider these two options for OPTION : SURCHARGE If you want to accelerate settiement such that an average degree of consolidation of 90% would be achieved in 2 years, how much surcharge would...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The water table is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m3 and a saturated unit weight of 18 kN/m3. The capillary rise in the sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m3....

  • You are evaluating the geotechnical characteristics of a Miami site for a proposed office buildin...

    You are evaluating the geotechnical characteristics of a Miami site for a proposed office building. Subsurface investigation showed that the site consists of the following layers: (1) a 5-ft sandy laver with a unit weight of 100 pcf (2) a 10-ft silty sand layer with a saturated unit weight of 115 pcf. (3) a 20-ft saturated clay layer with a unit weight of 118 pef, void ratio of 0.85, and underlain by gravels. The site seemed to have strong potential...

  • Show all work Thre foundations are constructed at the ground surface as shown in Figure 1....

    Show all work Thre foundations are constructed at the ground surface as shown in Figure 1. Calculate the settlement of the clay layer directly under point A at the center of the middle footing. Each large foundation carries a load of 3,200 kips and the small foundation carries a load of 1,200 kips. Note: Subdivide the clay layer into two 8-foot thick layers. Assume 1-D consolidation only. A-t20 Plan View 4' Sand; Ymoist 120 pcf Clay; Yvat-110 pcf, C.-0.25, Cr...

  • Example 2:3 The soil profile at a site consists of a 3 m thick sand layer...

    Example 2:3 The soil profile at a site consists of a 3 m thick sand layer (Ybulk -16.5 kN/m3 sat18.5 kN/m3) underlain by a 6 m thick clay layer (w-27%, Gs-270, m,-0.31 MPa", cv-2.6 m2/year), which is underlain by a gravel layer. A 3 m compacted fill with a unit weight of 20 kN/m3 is to be placed at ground level. a. What would be the final consolidation settlement? b. How long will it take for 50 mm of consolidation...

  • A 2-m thick of compacted soil of unit weight 20 kN/m3 will be placed on the top of the ground surface. Δσ y...

    A 2-m thick of compacted soil of unit weight 20 kN/m3 will be placed on the top of the ground surface. Δσ y 14.0 kN/m3 3.0 m Sand Y 17.5 kN/m3 2.0 m 3.0m A Soft clay y= 13.5 kN/m3 6.0 m Medium clay y=15.0 kN/m3 B 4.0 m Bedrock a) Before placing the compacted soil, what are the overconsolidation ratios (OCR) for point A and B? b) When placing the compacted soil, what external load Ag would be? c)...

  • geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick,...

    geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick, sandwich between two sand layers. The top sand layer has a density of 1.9 Mg/m² and is 5 m thick. Below this layer is a 10 m thick clay layer with a saturated density of 1.8 Mg/m' and a saturated water content 42%. The deeper sand layer has a saturated density of 1.9 Mg/m² and extend to the depth investigated at the site. The...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT