where, LCC -Life Cycle Cost
LP - Life Periods
TC - Total Cost
(c) Photovoltaic system installed to supply 2 kWh of energy per day pumping system which using centrifugal pump an...
22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system in Şohar University.-The peak sun hours in Oman.are 6 h and the expected Project Life (PL) is 24 years. The system is designed to have the components and rating is as shown in Table Q2a. Table Q2a also shows the actual costs, quantities and life periods of the various components that are considered for Life Cycle Cost (LCC) calculations....