22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system...
22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system in Şohar University.-The peak sun hours in Oman.are 6 h and the expected Project Life (PL) is 24 years. The system is designed to have the components and rating is as shown in Table Q2a. Table Q2a also shows the actual costs, quantities and life periods of the various components that are considered for Life Cycle Cost (LCC) calculations. Assume the interest and inflation rates in Oman are 7% and 4%, respectively. Calculate the LCC of the system. [12 Marks] Table Q2a FCuaptityToaost fe periods AUSD Ratin LR(Vears 24 200 Wp Vmp 40 V, Imp 5A, 20 7,800 PV modures 6 12V, 100A 12 450 HO7 RNF/HO7 VK 24 850 1175 32 Contractor specifications St 200 Maintenance AMC
22 marks Question 2: (a) Photovoltaic system installed to supply 24 kWh, of energy per day to a DC lighting system in Şohar University.-The peak sun hours in Oman.are 6 h and the expected Project Life (PL) is 24 years. The system is designed to have the components and rating is as shown in Table Q2a. Table Q2a also shows the actual costs, quantities and life periods of the various components that are considered for Life Cycle Cost (LCC) calculations. Assume the interest and inflation rates in Oman are 7% and 4%, respectively. Calculate the LCC of the system. [12 Marks] Table Q2a FCuaptityToaost fe periods AUSD Ratin LR(Vears 24 200 Wp Vmp 40 V, Imp 5A, 20 7,800 PV modures 6 12V, 100A 12 450 HO7 RNF/HO7 VK 24 850 1175 32 Contractor specifications St 200 Maintenance AMC