Spring 2019 ck dozer cost $235,000 to purchase. FOG and minor $235 nhr A major engine repair costing CET 470 infrastructure, Heavy Highway aan n. 58) A track 2. Infrastructure, Heavy Highway and Equipment Homework 1 Equipment Economics the Interest Table to calculate values. Show your calculations and procedures Instruction: Use a cash flow diagram. Otherwise, the deduction will be applied. new truck for $125,000 and plans to use the truck for 6 years. tractor has purchased a After 6 years of use, the estimated salvage value for the truck will be $30,000. What is 1. A con the contractors annual cost (annual uniform series) for the truck at an interest rate of 10%? (20 Points)

0 0
Add a comment Improve this question Transcribed image text
Answer #1


Cost of truck = $125,000

Salvage value = $30,000

Interest rate = 10%

Time period = 6 years

Calculate the annual cost -

Annual cost = Cost of truck (A/P, i, n) - Salvage value(A/F, i, n)

Annual cost = $125,000(A/P, 10%, 6) - $30,000(A/F, 10%, 6)

Annual cost = ($125,000 * 0.22961) + ($30,000 * 0.12961)

Annual cost = $28,701.25 - $3,888.30

Annual cost = $24,812.95

The annual cost is $24,812.95

Following is the required cash flow diagram -

S S30,000 i-10% 3 A S24,812.95 P S125,000

Add a comment
Know the answer?
Add Answer to:
Spring 2019 ck dozer cost $235,000 to purchase. FOG and minor $235 nhr A major engine...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • CET 470 Infrastructure, Heavy Highway and Equipment Spring 2019 m 2.9 on p. 58) A track...

    CET 470 Infrastructure, Heavy Highway and Equipment Spring 2019 m 2.9 on p. 58) A track dozer cost $235,000 to purchase. FOG and minor 2. (Modified Proble maintenance are estimated at $42.00 per operating hr. A major engine repair $28,000 will be required after 9,000 hrs of use. The expected resale price (salvage value 25% of the original purchase price. The machine should last 12,000 hrs. How much should the owner of the machine charge per hour of use, if...

  • ure, Heavy Highway and Equipment Spring 2019 Homework 1 Equipment Economics Instruction: Use the Interest Table...

    ure, Heavy Highway and Equipment Spring 2019 Homework 1 Equipment Economics Instruction: Use the Interest Table to calculate values. Show your calculations and procedures for a full credit including a cash flow diagram. Otherwise, the deduction will be applied. A contractor has purchased a new truck for $125,000 and plans to use the truck for 6 years After 6 years of use, the estimated salvage value for the truck will be $30,000. What is the contractor's annual cost (annual uniform...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT