1.
Cost of assignment generated due to department A =
4*(30*15+5*20+0+30*50+0) = 8200
Cost of assignment generated due to department B =
4*(30*20+50*20+0+160*20+15*10) = 19800
Cost of assignment generated due to department C =
4*(0+50*20+30*10+0+30*5) = 5800
Cost of assignment generated due to department D =
4*(30*40+60*5+20*10+70*15+0)=11000
Cost of assignment generated due to department E =
4*(40*50+0+0+10*15+60*10) = 11000
Cost of assignment generated due to department F =
4*(0+0+30*5+20*10+50*10) = 3400
Total cost of the current assignment =8200+19800+5800+11000+11000+3400 = 59200
Correct answer is C. $59200
2.
Cross-docking avoids placing the materials or supplies in storage by processing them as they are received for shipment
Correct answer is D.avoids placing the materials or supplies in storage by processing them as they are received for shipment.
3.
Empowerment has the highest level of job expansion along the job design continuum
Correct answer is B.Empowerment
4. Correct answer is D. the human interface with the environment and machines
Ergonomics is the human interface with the environment and machines
please help me answer question 1 through 4 thank you An insurance claims processin any of...
An insurance company processes 800 claims per year. The average processing time for a claim is 5 weeks. 45 percent of all claims received are car insurance claims, 40 percent of all claims received are motorcycle insurance claims, 10 percent are boat insurance claims, and the remaining are house insurance claims. Hint: These are throughput values. On average there are, 20 car, 9 motorcycles, 12 boats, and some house claims in process. Hint: These are inventory values. Assume 50 weeks...
please I would like assistance with this which are question 1
and 2, thank you
2. We have 5 objects, and the weights and values are No. 2 3 4 5 10 20 30 50 V 20 30 66 60 55 W 40 The knapsack can carry a weight not exceeding 90, find a subset items and give the total weight and value for following algorithms: 1) By using the algorithm of greedy of value for 0-1 knapsack problem? By...
make sure the answer is
correct 100%
Exercise 1: Suppose that 5 jobs will be processed on a single machine. The jobs are ready for processing at time. The other job characteristics are as shown in the table below. Find the: Mean flow time, Average tardiness and number of tardy jobs using: a. FCFS (30 Points) b. EDD (30 Points) Job Processing Time Due Date 10 20 B 20 30 С 4 10 D 16 24 E 6 8 F...
Please help me answer the question using the circuit. Any method
is acceptable. Thank You.
**HERE IS A SAMPLE TABLE
f
w
|Vi|
|VA|
|VC|
|VD|
|VA|/|Vi|
|VC|/|VA|
|VD|/|VC|
φA
φC
φC-φA
φD
φD-φC
10
100
1000
10000
R2 w P+15V R1 A R2 B 2 с C2 HE D 3 Vi C1 R3 Vo -15V 3. Let R1 = 2.7 k12, R2 = 51k, R3 = 15 k12, C1 = .1 uF, and C2 = .1 uF. Assume that...
please help me with question 3 and 4. thank you so much
3. Use the graph of the experimental vapor pressure to determine the normal boiling point of methyl butyl ether. Vapor Pressure mmHg TZU TITUT 0 10 20 30 40 50 60 70 80 90 100 110 120 T°C A) 19°C B) 52°CC) 60°C D) 64°C E) 70°C The molar enthalpy of vaporization of molecular compounds is A) always negative B) always positive C) negative if the boiling point...
Question Six a) At the College of Education and External Studies, 32% of the students are doing Project Planning and Management (PPM)degree. Six students from the College are selected at random. What is the probability that among the selected students () 3 are doing PPM (u) At least one is doing PPM () At most5 are doing PPM b) A project consists of nine activities for which the relevant information is given as follows: Activity Preceding Activity D IF A...
Please help me answer these question, thank you ! 1. Goods receipt can be only for materials received as stock items. a. True b. False 2. A reservation is a request to deliver a material for a production order, sales order, etc. a.True b. False 3. GR/IR stands for... a. Goods Resale/Inventory Resale b. Goods Receipt/Invoice Receipt c. Goods Restock/Inventory Resale d. General Rebate/Involuntary Rebate 4. The following are all basic Procurement processes except... a. Vendor Selection b. Purchase Requisition...
Please answer question 2 ASAP, thank you
Directions: Answer any Five (5) of the following Show all work partial credit granted problems. In the H-Atom an electron,い -16X1o" Coul crtits the proton, q 1.6x 101 Coul at a radial distance r 0.53 x 1010 m. Calculate: (a) The E-field at the position of the electron due to the proton; (b) The voltage at the position of the electron due to the proton; (c) The energy stored in the E-field generated...
Please help me with question # 2
Job Cost Flows, Journal Entries On April 1, Sangvikar Company had the following balances in its inventory accounts: Materials Inventory $12,760 Work-in-Process Inventory 21,350 Finished Goods Inventory 8,600 Work-in-process inventory is made up of three jobs with the following costs: Job 114 Job 115 Job 116 Direct materials $2,804 $2,640 $3,650 Direct labor 1,800 1,560 4,300 Applied overhead 1,080 936 2,580 During April, Sangvikar experienced the transactions listed below. a. Materials purchased on...
Can someone help me with #12 a) b) c) and d) and explain please!
thank you!
c) OD (c) Find Au. (e) Are A and B disjoint? (B) Find AB (d) Find B no. 11. Let C = {a, b, c, dy and D= {d, e, f}. (a) Find CUD. (b) Find CAD. (c) Find DUO. (d) Find Onc. (e) Are C and D disjoint? 12. Let A = {{ : XER and r - 3x + 2 = 0}...