a)Cutting materials, Assembling materials, Painting finished products, Packaging finished products.(6+7+4+1 days = 18 days)
b)1+4+9+6+7+6+7+4+1=45 days
c)18/45 = 40%
d)Receiving materials, storing materials, moving materials into
production
you cannot eliminate all these but reduce time
like receiving materials on a particular day of the month and
keeping enough safety stock
storing materials , like ordering when the safety stock is started
to be used
moving materaisl directly into production rather than storing
Resourceful Corporation is considering the implementation of a JIT inventory system. The company recently analyzed its...
La Lusts to its three wine vallen . es five models of kitchen appliances. The company is Identified the following activities performed at its E17-8 Wilmington, Inc, manufactures five models of kitchen appliances installing activity-based costing and has identified the following act Mesa plant. 1. Designing new models. 2. Purchasing raw materials and parts. 3. Storing and managing inventory. 4. Receiving and inspecting raw materials and parts. 5. Interviewing and hiring new personnel. 6. Machine forming sheet steel into appliance...
Managing activities across the value chain represents a comprehensive integrated approach to the traditional management functions of planning and control. Eliminating non-value-added activities from the chain is central to this strategic approach to cost management. Smith Corporation is considering the implementation of a JIT inventory system. The company recently analyzed its cycle time to determine the average number of days spent in each activity of its production process.
Yorba Company manufactures cuckoo clocks and uses an activity-based costing system to allocate overhead to its products. Each cuckoo clock consists of 6 separate parts totaling $80 in direct materials, $40 in direct labor and requires 1.5 hours of machine time to produce. Additional information follows: Activity Allocation Base Cost Allocation Rate Materials handling Number of parts $1.34 per part Machining Machine hours $2.50 per machine hour Assembling Number of parts $0.56 per part Packaging Number of finished units $2.19...
The company manufactures coffee tables and uses an activity-based costing system to allocate all manufacturing conversion costs. Each coffee tables consists of 20 separate parts totaling $190 in direct materials, and requires 4.0 hours of machine time to produce. What is the cost of packaging per coffee table? (round answer to nearest whole number.) Activity Allocation Base MOH Allocation Rate Materials Handling Number of Parts $1 per part Machining Machine Hours $3.5 per machine hour Assembling Number of Parts $2 per...
The Sit-N-Spin Corporation manufactures and assembles office chairs. Sit -N-Spin uses an activity-based costing system to allocate all manufacturing conversion costs. Each chair consists of 30 separate parts totaling $155 in direct materials, and requires 5 hours of machine time to produce. Additional information follows: Activity Allocation Base Cost Allocation Rate Materials handling Number of parts $1.75 per part Machining Machine hours $2.00 per machine hour Assembling Number of parts $4.50 per part Packaging Number of finished units $3.75 per...
After reviewing the new activity-based costing system that Nancy Chen has implemented at IVC's CenterPoint manufacturing facility, Tom Spencer, the production supervisor, believes that he can reduce production costs by reducing the time spent on machine setups. He has spent the last month working with employees in the plant to change over the machines more quickly with the same reliability. He plans to produce 109,000 units of the Sport model and 44,500 units of the Pro model in the first...
using P4-3A Shaker Stairs Co. designs and builds factory-made premium wooden stai ABC omes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2017 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $ 75,000 82,000 210,000...
Beaver Company manufactures coffee tables and uses an activity-based costing system to allocate all manufacturing conversion costs. Each coffee table consists of 30 separate parts totaling $250 in direct materials, and requires 7.0 hours of machine time to produce. Additional information follows: Activity Allocation Base Cost Allocation Rate Materials handling Number of parts $1.00 per part Machining Machine hours $3.20 per machine hour Assembling Number of parts $1.00 per part Packaging Number of finished units $3.00 per finished unit What...
Harold Company manufactures partner desks and uses an activity-based costing system to allocate all manufacturing conversion costs. Each partner desk consists of 20 separate parts totaling $220 in direct materials, and requires 7.0 hours of machine time to produce. Additional information follows: Activity Allocation Base Cost Allocation Rate Materials handling Number of parts $2.00 per part Machining Machine hours $3.10 per machine hour Assembling Number of parts $1.00 per part Packaging Number of finished units $4.00 per finished unit What...
Beaver Company manufactures coffee tables and uses an activity-based costing system. Each coffee table consists of 20 separate parts totaling $180 in direct materials, and requires 7 hours of machine time to produce. Additional information follows: Activity Materials handling Machining Assembling Packaging Allocation Base Number of parts Machine hours Number of parts Number of finished units Cost Allocation Rate $3.00 per part $2.80 per machine hour $5.00 per part $7.00 per finished unit What is the cost of materials handling...