Question

93. Tom and Mike are installing new flooring in their home. The house has 5 rooms of approximately equal size where the flooring will be replaced. Tom and Mike spent 3 hours
removing the old flooring from the first room. The average time to remove the flooring from 2 rooms is 2.25 hours per room. Determine the learning curve percentage experienced by Tom and Mike. Below are values that may be useful in answering this question. (95%) / In(2)--0074 In(90%), In(2)--0.152 in(85%) / ln(2)--0234 in(80%) / ln(2)--0322 in(75%)/In(2)--04 15 (70%) / In(2)--0515 а)70% b) 75% c)80% d) Some other percentage Answer: b Difficulty: Medium Learning Objective: Describe cost estimation techniques. CPA: Management Accounting/Problem-Solving and Decision-Making Bloomcode: Application 94. Consider the folilowing cost data for the cost object, number of machine setups. Each set of costs (A, B, and C) is from a different type of manufacturing operation and represents the cost behaviour for the cost of that companys machine setups. Number of Machine Setups Cost A CostB CostC 0 10 20 30 $80 37 20 40 60 80 100 78 81 79 91 123 154 50 Cost A is best described as: a) Fixed b) Variable c) Mixed d) Direct Answer: b Learning Objective: Describe the different types of cost behaviour, CPA: Management Aocounting/Problem-Solving and Decision-Making Difficulty: Easy or tranamiesion of this page is atty prohated
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Answer
A Determination of Leaning Curve Experienced by Tom and Mike
The correct answer is (b). The calculations are as follows.
1 Time taken for removing the floor of first room 3
2 Time taken for removing the floor of four rooms (cumulative) 9
3 Time taken for removing the floor of second room to fifth room 2.25
Leaning Curve experienced (3/4) 75%
B Cost category of Cost type A
The correct answer is (b). Cost A is variable cost.
Variable cost means, a cost that will increase with increase in the no. of units produced.

______________________________________________________________________

Add a comment
Know the answer?
Add Answer to:
93. Tom and Mike are installing new flooring in their home. The house has 5 rooms...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 46. Tom and Mike are installing new flooring in their home. The house has 5 rooms...

    46. Tom and Mike are installing new flooring in their home. The house has 5 rooms of approximately equal size where the flooring will be replaced. Tom and Mike spent 3 hours removing the old flooring from the first room. If Tom and Mike are operating with an 85% learning curve, what is the estimated average time to remove the flooring from all 5 rooms? Note: In(85%)/ In(2)--0.234. a) 2.05 hours total b) 2.05 hours per room c) 2.55 hours...

  • 40. The labour cost to construct the first unit of a special piece of equipment was...

    40. The labour cost to construct the first unit of a special piece of equipment was $126,000. If labour costs are subject to a 90% learning curve, what will be the cost to build the second unit? Use the following values as needed to respond In(95%) / ln(2)s-0074 In(90%) /ln(2) =-0.152 In(8596) / ln(2) =-0.234 In(80%) / In(2) =-0.322 n(75%)/In(2) =-0.415 In(70%)/In(2) -0.515 a) $126,000 b) $113,000 c) $100,800 d) $113,400 Answer: d 41 A firm will build 8 units...

  • 5. Consider the following cost data for the cost object, number of machine setups. Each set...

    5. Consider the following cost data for the cost object, number of machine setups. Each set of costs (A, B, and C) is from a different type of manufacturing operation and represents the cost behaviour for the cost of that company's machine setups. Number of Machine Setups CostA CostB Cost $80 79 82 78 81 79 10 20 30 20 37 91 123 154 100 Cost B is best described as: a) Fixed b) Variable c) Mixed d) Discretionary Answer:ta...

  • 60. Smith Company is attempting to develop the cost function for repair costs. The following past...

    60. Smith Company is attempting to develop the cost function for repair costs. The following past data are available: Machine Hours 4,800 3,400 4,000 5,900 Repair Costs $6,385 4,585 5,285 7,085 Using the high-low method, what is the variable repair cost per machine hour? a) $0.15 b) $1.00 c) $4.00 d) $5.00 Answer: b Difficulty: Easy Learning Objective: Describe cost estimation techniques CPA: Management Accounting/Problem-Solving and Decision-Making Bloomcode: Application 61. Smith Company is attempting to develop the cost function for...

  • 76. An organization's accountant is estimating next period's total overhead costs. She performed two regression analyses,...

    76. An organization's accountant is estimating next period's total overhead costs. She performed two regression analyses, one based on direct labour hours and the other based upon machine hours. The results were: Total overhead $150,000+ $4 x direct labour hours Adjusted R-square- 0.65 Total overhead $130,000 + $5 x machine hours Adjusted R-square 0.77 For the next period, the accountant anticipates using 28,000 direct labour hours and 26,000 machine hours. Based upon this information, what is the best estimate for...

  • 76. An organization's accountant is estimating next period's total overhead costs. She performed two regression analyses,...

    76. An organization's accountant is estimating next period's total overhead costs. She performed two regression analyses, one based on direct labour hours and the other based upon machine hours. The results were: Total overhead $150,000+ $4 x direct labour hours Adjusted R-square- 0.65 Total overhead $130,000 + $5 x machine hours Adjusted R-square 0.77 For the next period, the accountant anticipates using 28,000 direct labour hours and 26,000 machine hours. Based upon this information, what is the best estimate for...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT