3. You are analyzing a project and have gathered the following data: Year Cash flow 0...

3. You are analyzing a project and have gathered the following data:

Year

Cash flow

0

-$275,000

1

$40,200

2

$31,800

3

$72,000

4

$80,000

5

$45,000

What is the NPV of this project if the required rate of return is 14 percent? Should this project be accepted?

-$95,931.81. No.

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
3. You are analyzing a project and have gathered the following data: Year Cash flow 0...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • 3. You are analyzing a project and have gathered the following data: Cash flow -$275,000 S40,200...

    3. You are analyzing a project and have gathered the following data: Cash flow -$275,000 S40,200 $31,800 $72,000 $80,000 Y ear 0 2 4 What is the NPV of this project if the required rate of return is 14 percent? Should this project be accepted?

  • You are analyzing a project and have gathered the following data: Year Cash Flow 0 -$175,000...

    You are analyzing a project and have gathered the following data: Year Cash Flow 0 -$175,000 1 $56,400 2 $61,800 3 $72,000 4 $75,000    Cost of capital is 14%. Based on the profitability index of _____ for this project, you should _____ the project, using the new method. 0.1345; accept 0.0859; accept 0.0406; accept -0.0414; reject -0.0785; reject

  • You are analyzing a project and have prepared the following data: Year Cash Flow $169,000 $46,200...

    You are analyzing a project and have prepared the following data: Year Cash Flow $169,000 $46,200 I$87,300 $41,000 I$39,000 1 12 4 Required payback period 2.5 years Required return 8.50% the project. Based on the profitability index of 0.97; accept for this project, you should 1.05; accept 1.18; accept 0.97; reject 1.05; reject Question 15 You are analyzing a project and have prepared the following data: Year Cash Flow $169,000 $46,200 $87,300 $41,000 $39,000 Required payback period 2.5 years Required...

  • Magellen Industries is analyzing a new project. The data they have gathered to date is as...

    Magellen Industries is analyzing a new project. The data they have gathered to date is as follows: Lower Bound Expected Value Upper Bound Sales quantity 9500 10000 10500 Sales price per unit $9.75 $10.00 $10.25 Variable cost per unit $4.80 $5.20 $5.60 Fixed cost $15,000.00 $18,000.00 $21,000.00 Initial requirement for equipment: $120,000 Depreciation: Straight-line to zero over the four-year life of the project with no salvage value. Required rate of return: 15% Marginal tax rate: 35% What is the operating...

  • 3. You are considering two mutually exclusive projects with the following cash flows. Which project(s) should...

    3. You are considering two mutually exclusive projects with the following cash flows. Which project(s) should you accept if the discount rate is 8.5 percent? What if the discount rate is 13 percent? Year Project A Project B -$80,000 -$80,000 31,000 31,000 0 31,000 110,000 A. accept project A as it always has the higher NPV B. accept project B as it always has the higher NPV C. accept A at 8.5 percent and B at 13 percent D. accept...

  • Blue Water Systems is analyzing a project with the following cash flows. Should this project be...

    Blue Water Systems is analyzing a project with the following cash flows. Should this project be accepted based on the modified internal rate of return if the discount rate is 12 percent? Why or why not? Year   Cash flow 1    -260,000 2 85,000 3 128,600 4    96,780

  • A project has the following cash flows: Year Cash Flow 65,500 165,500 0 1 39,000 -33,600...

    A project has the following cash flows: Year Cash Flow 65,500 165,500 0 1 39,000 -33,600 a. What is the IRR for this project? (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.a.. 32.16.) b. What is the NPV of this project if the required return is 5 percent? (A negative answer should be indicated by a minus sign. Do not round intermediate calculations and round your answer to 2 decimal...

  • A project has the following cash flows: Year Cash Flow 0 $ 66,500 1 –41,000 2...

    A project has the following cash flows: Year Cash Flow 0 $ 66,500 1 –41,000 2 –32,800 What is the IRR for this project? (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) Internal rate of return             % What is the NPV of this project if the required return is 4 percent? (A negative answer should be indicated by a minus sign. Do not round intermediate calculations and round your...

  • Two mutually exclusive projects have the following projected cash flows: Year Project A Cash flow Project...

    Two mutually exclusive projects have the following projected cash flows: Year Project A Cash flow Project B Cash Flow 0 -$50,000 -$50,000 1 25,625 0 2 25,625 0 3 25,625 0 4 25,625 0 5 15,625 150,000 If the required rate of return on these projects is 20 percent, what are the NPVs of two projects? Which project should be better? If they are standalone projects, what is the choice? If IRRA = 40.36%, IRRB = 24.57%, which project should...

  • A project has the following cash flows: year. Cash flow 0. $71,000 1. -50,000. 2. -29,200...

    A project has the following cash flows: year. Cash flow 0. $71,000 1. -50,000. 2. -29,200 a. What is the IRR for the project? (Do not round intermediate calculations and enter answer as a percent round to 2 decimal places) b. What is the NPV of this project if the required return is 6 percent? c. What is the NPV of the project if the required return is 0 percent? d. What is the NPV of the project if the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT