UNIT CODE: BAF2202 UNIT TITLE: MANAGEMENT ACCOUNTING I
Required:
iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units
UNIT CODE: BAF2202 UNIT TITLE: MANAGEMENT ACCOUNTING I Assume that a certain process has an 95% learning curve effect and the first unit took 4000hrs to produce. Required: Compute the number of hours required to produce the first 34 units Compute the number of hours required to produce 34th unit. iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units Differentiate between management accounting and financial accounting Highlight the assumptions...
Assume that a certain process has an 95% learning curve effect and the first unit took 4000hrs to produce. Required: Compute the number of hours required to produce the first 34 units (3 Marks) Compute the number of hours required to produce 34th unit. (2 Marks) iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units
b) Assume that a certain process has an 95% learning curve effect and the first unit took 4000hrs to produce. Required: i) Compute the number of hours required to produce the first 34 units (3 Marks) ii) Compute the number of hours required to produce 34th unit. (2 Marks) iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units
UNIT CODE: BAF2202 UNIT TITLE: MANAGEMENT ACCOUNTING I QUESTION TWO Shell Ltd is trying to decide whether or not to drill for oil on a particular site in North Eastern Kenya. The Chief Engineer has assessed the probabilities that there will be oil as follow, based on past experience. Oil 0.2 No oil 0.8 It is possible for Shell ltd to hire a firm of international consultants to carry out a complete survey of the site. Shell...
a) Outline the objectives of management accounting (3 Marks) b) Assume that a certain process has an 95% learning curve effect and the first unit took 4000hrs to produce. Required: i) Compute the number of hours required to produce the first 34 units (3 Marks) ii) Compute the number of hours required to produce 34th unit. (2 Marks) iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units...
40. The labour cost to construct the first unit of a special piece of equipment was $126,000. If labour costs are subject to a 90% learning curve, what will be the cost to build the second unit? Use the following values as needed to respond In(95%) / ln(2)s-0074 In(90%) /ln(2) =-0.152 In(8596) / ln(2) =-0.234 In(80%) / In(2) =-0.322 n(75%)/In(2) =-0.415 In(70%)/In(2) -0.515 a) $126,000 b) $113,000 c) $100,800 d) $113,400 Answer: d 41 A firm will build 8 units...
Exercise 5-46 Learning Curves (LO 5-6) Assume that General Dynamics, which manufactures high-technology instruments for spacecraft, is considering the sale of a navigational unit to a government agency in India that wishes to launch its own communications satellite. The government agency plans to purchase 8 units, although it would also consider buying 16 units. General Dynamics has started a chart relating labor time required to units produced. Unit Produced (X) Time Required to produce the Xth Unit 23,000 hours 16.100...
(1) Let us suppose it costs $70 to produce the 80th unit, assuming a learning rate of 95%, determine the cost of the 160th unit. (2) If the 4th unit took 24 hours to produce, and the 20th unit took 19 hours to produce, what would the learning rate be? Note: Express your answer in decimal places, i.e., if your answer is 40.56%, enter in 0.4056. (3) Let us suppose it costs $500 to produce the 120th unit, assuming a...
Assume that General Dynamics, which manufactures high-technology instruments for spacecraft, is considering the sale of a navigational unit to a government agency in India that wishes to launch its own communications satellite. The government agency plans to purchase 8 units, although it would also consider buying 16 units. General Dynamics has started a chart relating labor time required to units produced. Time Required to Unit Produce Produced (x) the Xth Unit 13,000 hours 7,800 hours 4 4,680 hours 8 1...
Assume that General Dynamics, which manufactures high-technology instruments for spacecraft, is considering the sale of a navigational unit to a government agency in India that wishes to launch its own communications satellite. The government agency plans to purchase 8 units, although it would also consider buying 16 units. General Dynamics has started a chart relating labor time required to units produced. Time Required to Unit Produce Produced (x) the Xth Unit 13,000 hours 7,800 hours 4 4,680 hours 8 1...