Problem

Continuing the preparation of the proposal for the Waffle treatment plant ( Problem 3-15...

Continuing the preparation of the proposal for the Waffle treatment plant ( Problem 3-15 ), design the flocculation tank by providing the following for the first two compartments only:

1. Water power input in kW

2. Tank dimensions in m

3. Diameter of the impeller in m

4. Rotational speed of impeller in rpm

Use the following assumptions:

1. Number of tanks = 1 (with 1 backup)

2. Tapered G in three compartments: 60, 50, and 20 s 1

3. Detention time = 30 min

4. Depth = 3.5 m

5. Impeller type: axial-flow impeller, three blades, Np = 0.43

6. Available impeller diameters: 1.0, 1.5, and 2.0 m

7. Assume B = (1/3) H

Problem 3-15

Your boss has assigned you the job of designing a rapid-mix tank for the new water treatment plant for the town of Waffle. The design flow rate is 0.050 m3 /s. The average water temperature is 8oC. The following design assumptions for a rapid-mix tank have been made:

1. Number of tanks = 1 (with 1 backup)

2. Tank configuration: circular with liquid depth = 1.0 m

3. Detention time = 5 s

4. Velocity gradient = 750 s 1

5. Impeller type: turbine, 6 flat blades, N p = 3.6

6. Available impeller diameters: 0.25, 0.50, and 1.0 m

7. Assume B = (1/3) H

Design the rapid-mix system by providing the following:

1. Water power input in kW

2. Tank dimensions in m

3. Diameter of the impeller in m

4. Rotational speed of impeller in rpm

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 3