Using Table 3-4 , select a combination of in-line blenders to mix ferric chloride with a design flow rate that varies from a minimum of 8,200 m3/d in winter to a maximum of 49,200 m3/d in summer. The design water temperatures are 4o C in the winter and 15o C in the summer. The plant will operate 8 hours per day for seven days per week in the winter and 24 hours per day for seven days per week in the summer. Assume that the water power is 80% of the motor power and that the mixing time must be between 0.3 and 0.8 s. Because this problem will require some iteration, a spreadsheet solution is highly recommended.
Table 3-4
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.