Problem

The article “Uncertainty Estimation in Railway Track Life- Cycle Cost” (J. of Rail and R...

The article “Uncertainty Estimation in Railway Track Life- Cycle Cost” (J. of Rail and Rapid Transit, 2009) presented the following data on time to repair (min) a rail break in the high rail on a curved track of a certain railway line.

A normal probability plot of the data shows a reasonably linear pattern, so it is plausible that the population distribution of repair time is at least approximately normal. The sample mean and standard deviation are 249.7 and 145.1, respectively.

a. Is there compelling evidence for concluding that true average repair time exceeds 200 min? Carry out a test of hypotheses using a significance level of .05.

b. Using σ = 150, what is the type II error probability of the test used in (a) when true average repair time is actually 300 min? That is, what is β(300)?

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search