Rework Example 5-1 as described in Problem and also assume that subbasin 2 has been developed into 1/4-ac residences. Let the values for TC = 1.14 and R = 3.5. Plot the final hydrograph for the whole basin vs. the original one in Example 5-1. Discuss the differences.
Problem
Rework Example 5-1, assuming the same type of soil and that the woods in subbasin 1 have grown much denser and provide good cover. Run the revised HEC-HMS and then graph the original and the updated discharge hydrographs from subbasin 1. How does the curve number affect the amount of runoff?
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.