Problem

When to replace a maintenance system. An article in the Journal of Quality of Mainte...

When to replace a maintenance system. An article in the Journal of Quality of Maintenance Engineering (Vol. 19, 2013) studied the problem of finding the optimal replacement policy for a maintenance system. Consider a system that is tested every 12 hours. The test will determine whether there are any flaws in the system. Assume the probability of no flaw being detected is .85. If a flaw (failure) is detected, the system is repaired. Following the 5th failed test, the system is completely replaced. Now let x represent the number of tests until the system needs to be replaced.

a. Give the probability distribution for x as a formula.

b. Find the probability that the system needs to be replaced after 8 total tests.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search