Determining job costs, using the ABC method
Job 19AB required $10,000 for direct materials, $4,000 for direct labor, 300 direct labor hours, 150 machine hours, three setups, and five design changes. The cost pools and overhead rates for
each pool follow :
Determine the cost of Job 19AB.