Determining total job costs, using predetermined overhead rate
Melanie-Rae Manufacturing Co. uses the job order cost system of accounting. The following is a list of the jobs completed during March, showing the charges for materials requisitioned and for direct labor.
Assume that factory overhead is applied on the basis of direct labor costs and that the predetermined rate is 200%.
Required:
1. Compute the amount of overhead to be added to the cost of each job completed during the month.
2. Compute the total cost of each job completed during the month.
3. Compute the total cost of producing all the jobs finished during the month.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.