Given the following data, route a storm hydrograph through a full reservoir and plot on th...

Given the following data, route a storm hydrograph through a full reservoir and plot on the same graph the inflow and resulting outflow hydrograph for the Green Acre watershed. The bottom of the rectangular spillway is placed at an elevation of 980.0 ft. The following data are given: area = 0.64 mi2; length = 1.10 mi; Lca = 0.53 mi; Ct = 2.00: Cp = 0.62; outflow = CYH3/2; C = 3.5; L = 10 ft; and the following storage–elevation curve table.

(a) Find the 15-min unit hydrograph by Snyder’s method.


(b) Find the 30-min unit hydrograph.


(c) Find the hydrograph that results from 1.8 in. of rain for the first 30 min and 0.63 in. for the next 15 min.


(d) Develop a (2St) + O versus O curve using a routing period of 15 min and the outflow and storage curves provided.


(c) Route the storm hydrograph through the reservoir assuming it is full to the bottom of the spillway elevation 980 ft.


(f) Indicate the maximum height of the water in the reservoir.


(g) At what elevation should the top of the dam be placed to obtain 5 ft of free-board?

Elevation (ft)

Incremental storage (10−4 ft3)r.

Total storage (10−4 ft3)

960

 

0

970

40

40

980

210

250

990

590

840

 

1240

 

1000

 

2080

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search