Terminology. Match each item on the left with the most appropriate item on the right.
1. “Ad hoc” processes | a. Test (SDLC) |
2. Business rules | b. Risk of SDLC |
3. Consistent project standards | c. Repeatable (CMM) |
4. Cost overrun | d. Optimized (CMM) |
5. Discrete project standards | e. Managed (CMM) |
6. Feasibility study | f. Initiation/planning (SDLC) |
7. Improvement part of organizational culture | g. Design (SDLC) |
8. Modular programming code | h. Defined (CMM) |
9. Simulations | i. Chaotic (CMM) |
10. Statistical project control | j. Build (SDLC) |
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.