Traditional Product Costing Versus Activity-Based
Costing
High Country Outfitters, Inc., makes backpacks for large sporting
goods chains that are sold under the customers' store brand names.
The accounting department has identified the following overhead
costs and cost drivers for next year:
Overhead Item | Expected Costs |
Cost Driver |
Maximum Quantity |
---|---|---|---|
Setup costs |
$1,404,000 |
Number of setups |
7,200 |
Ordering costs |
360,000 |
Number of orders |
60,000 |
Maintenance |
1,200,000 |
Number of machine hours | 80,000 |
Power |
120,000 |
Number of kilowatt hours |
600,000 |
Total predicted direct labor hours for next year is 60,000. The following data are for two recently completed jobs:
Job 201 | Job 202 | |
---|---|---|
Cost of direct materials | $18,500 | $20,000 |
Cost of direct labor | $24,125 | $76,250 |
Number of units completed | 1,125 | 915 |
Number of direct labor hours | 270 | 330 |
Number of setups | 18 | 22 |
Number of orders | 24 | 45 |
Number of machine hours | 540 | 450 |
Number of kilowatt hours | 270 | 360 |
a. Determine the unit cost for each job using a traditional
company-wide overhead rate based on direct labor hours.
Round rate to two decimal places.
Overhead rate per direct labor hour $Answer
Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed.
Job 201 | Job 202 | |
---|---|---|
Direct materials | Answer | Answer |
Direct labor | Answer | Answer |
Overhead | Answer | Answer |
Total job cost | Answer | Answer |
Units | Answer | Answer |
Per unit cost | Answer | Answer |
Round answers to two decimal places, if needed.
Setup costs |
Answer |
Ordering costs |
Answer |
Maintenance costs | Answer |
Power |
Answer |
NOTE: Round all answers (except cost per unit) to
the nearest whole number, when applicable. Round cost per unit
answers to two decimal places.
Job 201 | Job 202 | |
---|---|---|
Direct materials | Answer | Answer |
Direct labor | Answer | Answer |
Overhead | ||
Setup cost | Answer | Answer |
Ordering costs | Answer | Answer |
Maintenance costs | Answer | Answer |
Power | Answer | Answer |
Total job costs | Answer | Answer |
Units produced | Answer | Answer |
Cost per unit | Answer | Answer |
Traditional Product Costing Versus Activity-Based Costing High Country Outfitters, Inc., makes backpacks for large sporting goods...
Traditional Product Costing Versus Activity-Based Costing High Country Outfitters, Inc., makes backpacks for large sporting goods chains that are sold under the customers' store brand names. The accounting department has identified the following overhead costs and cost drivers for next year: Overhead Item Expected Costs Cost Driver Maximum Quantity Setup costs $1,216,800 Number of setups 7,200 Ordering costs 312,000 Number of orders 60,000 Maintenance 1,200,000 Number of machine hours 80,000 Power 120,000 Number of kilowatt hours 600,000 Total predicted direct...
Traditional Product Costing versus Activity-Based Costing Ridgeland Inc. makes backpacks for large sporting goods chains that are sold under the customers' store brand names. The Accounting Department has identified the following overhead costs and cost drivers for next year: Overhead Item Expected Costs Cost Driver Maximum Quantity Setup costs $734,400 Number of setups 7,200 Ordering costs 195,000 Number of orders 65,000 Maintenance 1,380,000 Number of machine hours 80,000 Power 132,000 Number of kilowatt hours 440,000 Total predicted direct labor hours...
Traditional Product Costing versus Activity-Based Costing Ridgeland Inc, makes backpacks for large sporting goods chains that are sold under the customers' store brand names. The Accounting Department has identified the following overhead costs and cost drivers for next year: Overhead Item Expected Costs Cost Driver Maximum Quantity Setup costs.......... $489,600 Number of setups............ 7,200 Ordering costs ....... 130,000 Number of orders............ 65,000 Maintenance......... 920,000Number of machine hours.... 80,000 Power ........ 88,000 Number of kilowatt hours..... 440,000 Total predicted direct labor...
Traditional Product Costing Versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $240,000, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Assembly setups $63,000 Setup hours Materials handling 33,000 Number of moves Assembly 120,000 Assembly hours Maintenance 24,000 Maintenance hours Total $240,000 Activity Level 1,500 300 12,000 1,200 Total direct labor hours used during the month were 8,000....
EXPLAIN STEP BY STEP Traditional Product Costing versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $1,591,000, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Activity Level Assembly setups $ 330,000 Setup hours 2,000 Materials handing 162,000 Number of moves 600 Assembly 900,000 Assembly hours 18,000 Maintenance 199,000 Maintenance hours 1,990 Total $1,591,000 Total direct labor hours used...
Need help please. Traditional Product Costing versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $954,600 consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Activity Level Assembly setups $ 198,000 Setup hours 2,000 Materials handing 97,200 Number of moves 600 Assembly 540,000 Assembly hours 18,000 Maintenance 119,400 Maintenance hours 1,990 Total $954,600 Total direct labor hours used during...
Traditional Product Costing versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $1,272,800 consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Activity Level Assembly setups $ 264,000 Setup hours 2.000 Materials handing 129,600 Number of moves 600 Assembly 720,000 Assembly hours 18,000 Maintenance 159,200 Maintenance hours 1.990 Total $1,272,800 Total direct labor hours used during the month were...
Traditional Product Costing Versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $192,000, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Activity Level Assembly setups $39,000 Setup hours 1,500 Materials handling 9,000 Number of moves 300 Assembly 120,000 Assembly hours 12,000 Maintenance 24,000 Maintenance hours 1,200 Total $192,000 Total direct labor hours used during the month were 8,000....
Bonita Inc. has identified the following overhead costs and cost drivers for next year. Overhead Item Expected Cost Cost Driver Expected Actual Transactions Setup costs $87,912 No. of setups 396 Ordering costs 46,800 No. of orders 3,900 Maintenance costs 125,000 Machine hours 25,000 Power 26,495 Kilowatt hours 75,700 The following are two of the jobs completed during the year: Job 700 Job 701 Direct materials $1,200 $600 Direct labour $890 $420 Units completed 250 100 Direct labour hours 40 20...
QUESTION 1 P Flag question Marked out of 25.00 Not yet answere d Traditional Product Costing Versus Activity-Based Costing Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $252,000, consisting of the following activity cost pools for the current month: Activity Centers Activity Costs Cost Drivers Activity Level Assembly setups $69,000 Setup hours 1,500 Materials handling Number of moves 39,000 300 120,000 Assembly hours Assembly 12,000 Maintenance 24,000 Maintenance hours...