Question

(10 points) The normal time for a repetit h atduces two work per ce min. The plant uses a PFD allowance factor of 15 Determin
0 0
Add a comment Improve this question Transcribed image text
Answer #1

As per HOMEWORKLIB POLICY and guideline, the first unrelated question is answered below:

3.

PFD allowance is the grace time that may be required for a job or work if making an unavoidable delay.

The percentage should be charged on the normal time in order to get such grace time.

Normal time = 3.0 minute

Grace time = Normal time × PFE allowance

                        = 3.0 × 15%

                        = 0.45 minute

a.

Standard time = Normal time + Grace time

                        = 3.0 + 0.45

                        = 3.45 minute per piece

b.

There are 8 hours, means (8 × 60 =) 480 minutes

Required units = 480 minutes / Standard minutes per piece

                        = 480 / 3.45

                        = 139.130435

                        = 139 rounded to whole number

Add a comment
Know the answer?
Add Answer to:
(10 points) The normal time for a repetit h atduces two work per ce min. The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. (18 points) the standard time is to be established study. The observed time for the...

    1. (18 points) the standard time is to be established study. The observed time for the cycle averaged 4.8 min. The worker's performance was rated at 90 which took 2.0 min, rated at 120%. The PFD allowance for the class of work is 15%. Determine (1) The normal time, (b) the standard time for the cycle, and (c) the worker's efficiency if the work produces 123 work units during an 8-hour shift. for a manual work cycle by direct time...

  • (20 points) A direct time study is performed to obtain average time and performance rating values...

    (20 points) A direct time study is performed to obtain average time and performance rating values for the work elements in a certain repetitive task. The values are given in the table below. Elements a, b, and c are worker-controlled. Element d is a machine-controlled element and its time is the same each cycle (N.A.means performance rating is not applicable). Element c is performed while the machine is performing its cycle (element d). Element e is a worker- controlled irregular...

  • A worker-machine operation was found to involve 40 minutes of machine time per cycle in the...

    A worker-machine operation was found to involve 40 minutes of machine time per cycle in the course of 40 cycles of stopwatch study The worker's time averaged 25 minutes per cycle, and the worker was given a rating of 115 percent machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 15 percent of work time which is applied only to the worker element not the machine element), determine...

  • What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that ...

    What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...

  • The work shift at the ABC Company runs fr lunch from 11:30 to 12:15 p.m. that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-minute res...

    The work shift at the ABC Company runs fr lunch from 11:30 to 12:15 p.m. that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-minute rest breaks during working hours (paid time), one in the morning and one in the afternoon. The com m. to 4:15 p.m. with a 45 minute break for pany also allows 25 minute day for personal needs (paid time). In addition, a work...

  • Problem 2: A company wishes to assign multiple machines to an operator to minimize costs The foll...

    Problem 2: A company wishes to assign multiple machines to an operator to minimize costs The following times have been collected: Loading machine standard time 034 min Unloading machine standard time Walk time between machines Operator rate Machine rate Power feed time (machining time) 0.26 min 0.09 min $15.00/h S22.00/h 1.56 min - 1. 2. 3. 4. 5. Determine the optimal number of machines per operator to minimize unit cost. Create a worker-machine chart. (Suggestion: use Excel or insert a...

  • A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the...

    A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 2.1 minutes per cycle, and the worker was given a rating of 111 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 11 percent of work time which is applied only to the worker element (not the machine element), determine...

  • 3.2 The observed element times and performance ratings collected in a direct time study are indicated...

    3.2 The observed element times and performance ratings collected in a direct time study are indicated in the table below. The snapback timing method was used. The PFD allowance in the plant is 14%. All elements are regular elements in the work cycle. Determine (a) the normal time and (b) the standard time for the cycle Work element Observed time (min) Performance rating(%) 0.22 90 0.41 120 0.30 100 0.37 90

  • A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy ...

    A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy Results" Operation: C: Normal TIme for the "Label and Package Reports Operation: D: Normal Time for "Distribution Reports" Operation: E: Normal Time for the ENTIRE OPERATION PROCESS F: The Standard Time for this Process: G: The number of Operations that are required for a 90, 95, and 99% confidence level with 5% accuracy? Based on a careful work study in the Hofstetter Corp., the...

  • A rider lawn mower is produced on a manual assembly line. Work content time=49.5 min. The...

    A rider lawn mower is produced on a manual assembly line. Work content time=49.5 min. The line has 25 workstations with a manning level = 1.2. Available shift time per day = 8 hr, but equipment downtime during the shift reduces actual production time to 7.5 hr on average. This results in an average daily production of 244 units/day. Repositioning time per worker = 5% of cycle time. Determine (a) line efficiency, (b) balancing efficiency, and (c) repositioning time.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT