A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the...

A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 2.1 minutes per cycle, and the worker was given a rating of 111 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 11 percent of work time which is applied only to the worker element (not the machine element), determine the standard time for this job. (Do not round intermediate calculations. Round your final answer to 2 decimal places.)

Standard time _______ minutes

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A worker-machine operation was found to involve 40 minutes of machine time per cycle in the...

    A worker-machine operation was found to involve 40 minutes of machine time per cycle in the course of 40 cycles of stopwatch study The worker's time averaged 25 minutes per cycle, and the worker was given a rating of 115 percent machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 15 percent of work time which is applied only to the worker element not the machine element), determine...

  • A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you ass...

    A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you assigned a performance rating of .95 and a work-day allowance factor of 20 percent, answer the following question: What is the Allowance Factor?

  • A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you ass...

    A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you assigned a performance rating of .95 and a work-day allowance factor of 20 percent, answer the following question: What is the Observed Time?

  • (20 points) A direct time study is performed to obtain average time and performance rating values...

    (20 points) A direct time study is performed to obtain average time and performance rating values for the work elements in a certain repetitive task. The values are given in the table below. Elements a, b, and c are worker-controlled. Element d is a machine-controlled element and its time is the same each cycle (N.A.means performance rating is not applicable). Element c is performed while the machine is performing its cycle (element d). Element e is a worker- controlled irregular...

  • The normal time for the "label and package reports" operation = minutes (round your response to...

    The normal time for the "label and package reports" operation = minutes (round your response to two decimal places). UU. VOLUP тогт" тоотроо UUUUUU. TIU, LLOILOPO % Problem 10.28 Question Help Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed: Performance Observation (minutes per cycle) 2 3 Rating 5 34 40 Element Prepare daily reports Photocopy results Label and package reports Distribute reports 39 11 37 * 12 120%...

  • A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy ...

    A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy Results" Operation: C: Normal TIme for the "Label and Package Reports Operation: D: Normal Time for "Distribution Reports" Operation: E: Normal Time for the ENTIRE OPERATION PROCESS F: The Standard Time for this Process: G: The number of Operations that are required for a 90, 95, and 99% confidence level with 5% accuracy? Based on a careful work study in the Hofstetter Corp., the...

  • a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response...

    a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = __________ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "distribute reports" operation = _________ minutes (round your response to two decimal places). The normal time for...

  • Observations (minutes per cycle) Element Rating 1 2 3 4 5 6 7 1 100% 2.0...

    Observations (minutes per cycle) Element Rating 1 2 3 4 5 6 7 1 100% 2.0 1.9 1.8 2.1 2.0 2.2 1.8 2 110% 7.5 7.7 7.2 7.5 8.2 7.4 7.0 3 110% 3.4 4.7 3.7 4.4 3.3 3.5 3.6 4 90% 10.3 11.3 12.7 10.1 12.2 12.1 10.2 Assuming a 25% allowance factor for the process, find the standard time for this process

  • A time study analyst observes a worker over a period of time and calculates that the worker requi...

    A time study analyst observes a worker over a period of time and calculates that the worker required 60.0 minutes per unit produced. The worker was rated by the analyst at a 120 percent performance rating, and an 15 percent allowance for personal time and fatigue applies. (1) What is the standard time for this task? (2) If a worker managed to produce 10 units in an eight-hour day, what would their day's pay be if the base rate is...

  • 1. (18 points) the standard time is to be established study. The observed time for the...

    1. (18 points) the standard time is to be established study. The observed time for the cycle averaged 4.8 min. The worker's performance was rated at 90 which took 2.0 min, rated at 120%. The PFD allowance for the class of work is 15%. Determine (1) The normal time, (b) the standard time for the cycle, and (c) the worker's efficiency if the work produces 123 work units during an 8-hour shift. for a manual work cycle by direct time...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT