A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become apart of the us interstate highway system, the B-C ratio method must be applied in the elevation. Investment costs of the structure are estimated to be 17,100,000, and 311,000 per occurance(no resurfacing cost in year 25). Revenues generated from the toll are anticipated to be 2,300,000 in its first year of operation, with a projected annual rate increase of 2% per year due to the anticipated annual increase in traffic across the bridge. Assuming that the initial surfacing of the bridge is included in the initial investment cost of the structure. the benefit cost ratio of the project with pw is?
A toll bridge across the Mississippi River is being considered as a replacement for the current...
A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,300,000, and $310,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every sixth year of its...
A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,300,000, and $310,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every sixth year of its...
A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,200,000, and $332,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every fourth year of its...
A city council considers to construct a new toll bridge across the river. Investment cost of the bridge is estimated to be $7,000,000 with an annual operating and maintenance costs of $130,000 per year. In addition, the bridge must go through a comprehensive maintenance in every fifth year of its 30-year expected life at a cost of $500,000 per occurrence (no cost in year 30). It is expected 200,000 vehicles per year to cross the bridge. The city plans to...
The answer is shown in the picture, i want to know how they got it, please show all your work and if you are using excel please show your formulas, Thank You and good luck. Toll lanes on a section of the 1-40 freeway are being considered in order to reduce traffic congestion and travel times Since this is a government project, the B-C ratio method must be applied in the evaluation. Construction costs of the project are estimated to...
Toll lanes on a section of the l-40 freeway are being considered in order to reduce traffic congestion and travel times. Since this is a government project, the B-C ratio method must be applied in the evaluation. Construction costs of the project are estimated to be $18,600,000, and $321,000 per year in operating and maintenance costs are anticipated. In addition, the lanes must be resurfaced every fourth year of their 20-year projected life at a cost of $1,110,000 per occurrence...