Toll lanes on a section of the 1-40 freeway are being considered in order to reduce traffic congestion and travel times SinceThe answer is shown in the picture, i want to know how they got it, please show all your work and if you are using excel please show your formulas, Thank You and good luck.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Resurfacing cost Environmental cost Net Revenue MRR PV of Net Revenue Year Revenue Construction cost AMC 0 1,62,00,000 1,62,0The above table shows the whole calculation where 2nd column representing revenue shows the revenue generated every year in the 20-year life of the freeway,given the 2.5% rate of increase per year. formula is : R1 + R1(1.025) + R1(1.025)2 + .....+ R1(1.025)19, where R1 is the revenue in the first year.

AMC(annual maintenance cost is fixed) and the initial construction cost is also fixed. Resurfacing cost occurs every 4th year.

environmental cost also increases by 2.5% every year. Therefore,applying the same formula as in revenue calculation.

Net Revenue is calculated as : Revenue - (AMC+resurfacing cost+ environmental cost)

Present value of net revenue is calculated by using MARR = 8% as the discount rate.

benefit:cost ratio is 19,171,418/16,200,000 = 1.18

Thus, the toll lanes must be constructed.

Add a comment
Know the answer?
Add Answer to:
The answer is shown in the picture, i want to know how they got it, please show all your work and if you are using excel please show your formulas, Thank You and good luck. Toll lanes on a section of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Toll lanes on a section of the l-40 freeway are being considered in order to reduce traffic congestion and travel times. Since this is a government project, the B-C ratio method must be applied in th...

    Toll lanes on a section of the l-40 freeway are being considered in order to reduce traffic congestion and travel times. Since this is a government project, the B-C ratio method must be applied in the evaluation. Construction costs of the project are estimated to be $18,600,000, and $321,000 per year in operating and maintenance costs are anticipated. In addition, the lanes must be resurfaced every fourth year of their 20-year projected life at a cost of $1,110,000 per occurrence...

  • A toll bridge across the Mississippi River is being considered as a replacement for the current 1...

    A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,300,000, and $310,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every sixth year of its...

  • A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas

    A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,200,000, and $332,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every fourth year of its...

  • A toll bridge across the Mississippi River is being considered as a replacement for the current...

    A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become a part of the U.S. Interstate Highway system, the B-C ratio method must be applied in the evaluation. Investment costs of the structure are estimated to be $17,300,000, and $310,000 per year in operating and maintenance costs are anticipated. In addition, the bridge must be resurfaced every sixth year of its...

  • A toll bridge across the Mississippi River is being considered as a replacement for the current...

    A toll bridge across the Mississippi River is being considered as a replacement for the current 1-40 bridge linking Tennessee to Arkansas. Because this bridge, if approved, will become apart of the us interstate highway system, the B-C ratio method must be applied in the elevation. Investment costs of the structure are estimated to be 17,100,000, and 311,000 per occurance(no resurfacing cost in year 25). Revenues generated from the toll are anticipated to be 2,300,000 in its first year of...

  • Can someone show me how they got these numbers, show all the work please, thank you. Correct answ...

    Can someone show me how they got these numbers, show all the work please, thank you. Correct answers are shown in picture. A bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road wil stfly a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the I two lanes will be required is currently being studied...

  • This is a major project so please show all formulas/work on Excel. Thank you so much!...

    This is a major project so please show all formulas/work on Excel. Thank you so much! Instructions Enter your name and Access ID (aa1234' format) in the cells above. The data required for this case will not appear until you do so. You are a financial manager for Zoom Corp., which manufactures bicycles. In the most recent fiscal year, Zoom manufactured and sold 20,000 bicycles. Wheels, seats, and brake calipers are three components of the bicycles currently manufactured by Zoom....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT