Question

A four-phase traffic signal is to be designed for a major intersection


A four-phase traffic signal is to be designed for a major intersection. The critical volume to saturation flow rates (v/s for each phase are given below 

image.png

a) If lost time per phase is 2 seconds, determine the cycle length such that the critical v/c ratio for the intersection is 0.92. The cycle length needs to be rounded up to the nearest multiple of 5 

b) For this cycle length, find the effective green times for each phase (Use the HCM method described in class to distribute the green time). Green times should be rounded to an integer 

c) For NB left turns (phase A), determine the capacity and the v/c ratio if the volume for NB LT is 400 vph.

3 1
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A four-phase traffic signal is to be designed for a major intersection
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • An intersection has a four-phase signal with the movements allowed in each phase

     An intersection has a four-phase signal with the movements allowed in each phase and the corresponding analysis and saturation flow rates shown in the table below. Please complete the following: a. Calculate the sum of flow ratios for the critical lane groups.  b. Calculate the minimum cycle length and effective green time for each phase (balancing v/c ratio for each lane group). Assume the lost time is 4 sec/phase and a critical intersection vc ratio of 0.95 is desired. c. Calculate the optimal...

  • 4.A two-phase signal system is to be designed for an isolated intersection with a peak hour tacto...

    Transportation Can correct the answer 4.A two-phase signal system is to be designed for an isolated intersection with a peak hour tactor 81 0.99. TIL lane volumes are: Phase A-550 veh/hr, Phase B 600 veh/hr, The total lost time L is 14 sec. Determine an appropriate cycle length for the intersection that will satisfy the following conditions: minimum cycle length-45 sec, maximum cycle length = 120 sec, maximum critical ve ratio (Xc)-0.85 and The saturation flow per lane for each...

  • An intersection has three phases, and the information for that intersection is provided in the ta...

    An intersection has three phases, and the information for that intersection is provided in the table below. Calculate: The sum of the flow ratios for the critical lane groups Minimum cycle length, optimal cycle length and effective green time for each phase using the minimum cycle length assuming the lost time is 4 seconds per phase and the critical intersection v/c of 0.90 is desired. The northbound approach delay and level of service. Phase 1 2 3 Allowed Movements NB...

  • The intersection has a four-timing-state signal with the movements allowed in each timing stage a...

    the intersection has a four-timing-state signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown in the table. a) calculate the minimum cycle length and effective green time for each timing stage (balancing v/c for the critical lane groups). assume the lsot time is 4 seconds per timing stage and a criticsl intersection v/c of 0.9 is desired. b) calculate the intersection control delay and level of service, assumjng pre-times isolated intersection. 4...

  • A pretimed signal controls a four-way intersection with no turning permitted and zero lost time.

    A pretimed signal controls a four-way intersection with no turning permitted and zero lost time. The eastbound and westbound traffic volumes are 500 and 600 veh/h. respectively, and the two movements share the same effective green and effective red portions of the cycle. The northbound and southbound directions also share cycle times, with volumes of 650 and 300 veh/h. If the saturation flow of castbound and westbound approaches is 2100 veh/h, and the saturation flow of northbound and southbound approaches...

  • For the given intersection, lost time is equal to 3.5 sec per phase and Y+AR is equal to 3 sec. W...

    For the given intersection, lost time is equal to 3.5 sec per phase and Y+AR is equal to 3 sec. Width of each lane is 10 feet. Estimate the signal timings for the intersection assuming a four phase operation. Phase A: serves north - south left turns only Phase B: serves north - south traffic (no left turns permitted) Phase C: serves east - west left turns only Phase D: serves east - west traffic (no left turns permitted) Assume...

  • A traffic signal control is being designed for an intersection on a divided highway with the char...

    A traffic signal control is being designed for an intersection on a divided highway with the characteristics shown in the table below. Determine an appropriate length of the yellow interval for each approach and how you will provide it. Assume the average vehicle length L is 20 ft, and the perception-reaction time ỗ is 1.0 sec. a is 1 1.2 ftSec2, g-32.2 ft/sec2 E-to-W Approaches 18 N-S Approaches Median width, (ft) 16 4 Number of 12 ft lanes on each...

  • 2. Determine the minimum cycle length for the intersection with the volumes shown on the table...

    2. Determine the minimum cycle length for the intersection with the volumes shown on the table below. The intersection is designed to have the following three phases: Phase A for left-turn movements from the EB and WB approaches; Phase B for the through and right movements from the EB and WB approaches; Phase C serving all movements for the NB and SB approaches. EB approach WB approach N B approach SB approach LT RLT RL TRL TR 110 500 200...

  • Can someone show me where I went wrong. Thanks! 13. Using the intersection information below, recommend a cycle length for a two-p hase traffic cle and peak hour signal using the Highway Capacity...

    Can someone show me where I went wrong. Thanks! 13. Using the intersection information below, recommend a cycle length for a two-p hase traffic cle and peak hour signal using the Highway Capacity Manual method. Use a loss time 7sper cy factor of 0.97 (20%) Peak hour volumes shown 484 Г 162 190 515 PHASE LANE GROUP SATURATION FLOw 1600 2 2800 31600 2800 2200 2200 าไ se equivalent volumus 10.64 4 Wor toogo S03 13. Using the intersection information...

  • Please help me with this transportation question Thank you so much. 1. You are a traffic...

    Please help me with this transportation question Thank you so much. 1. You are a traffic engineer for the City of Angola. You have been tasked to design a left turn lane on NB approach to an intersection Your signal timing for left turns indicate 10 seconds of "left turn only" green time and 50 seconds of red time each signal cycle. The green time will allow 4 left turns to be made each signal cycle. An average of 3...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT