1. You are a traffic engineer for the City of Angola. You have been tasked to design a left turn lane on NB approach to an intersection Your signal timing for left turns indicate 10 seconds of left turn only green time and 50 seconds of red time each signal cycle. The green time will allow 4 left turns to be made each signal cycle. An average of 3 left turning vehicles will approach the intersection each cycle. Space is limited, so you will need to use your engineering judgement to determine if the amount of time the through lane will be blocked due to vehicular queueing is acceptable a. What is the probability that no left turning vehicle will arrive during a signal cycle? b. If the turn lane has capacity for only 4 vehicles, what percent of the time will the through lane adjacent to the left turn bay be blocked? Explain why this is acceptable or not acceptable.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

ning -veh.cus-opf10aching The rmbar int Mlam0.049 0.O S5 16.3 Whi Me th t laゾ

Add a comment
Know the answer?
Add Answer to:
Please help me with this transportation question Thank you so much. 1. You are a traffic...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • I need answers with explanation please!! A-1. An exclusive through lane discharges 10 vehicles in 20...

    I need answers with explanation please!! A-1. An exclusive through lane discharges 10 vehicles in 20 seconds. In the same amount of time a mixed lef-and-through lane discharges 3 left turning vehicles and 4 through vehicles. The left-turn equivalent is: a. b. 2 c. 20 seconds d. 6.66 seconds e. 3.33 seconds A-2. Detectors, in actuated controller operations, measure time between vehicle actuations which is then compared to (circle one of the options below) to extend green time: a. Minimum...

  • A four-phase traffic signal is to be designed for a major intersection

    A four-phase traffic signal is to be designed for a major intersection. The critical volume to saturation flow rates (v/s for each phase are given below a) If lost time per phase is 2 seconds, determine the cycle length such that the critical v/c ratio for the intersection is 0.92. The cycle length needs to be rounded up to the nearest multiple of 5 b) For this cycle length, find the effective green times for each phase (Use the HCM method described...

  • 2. Determine the minimum cycle length for the intersection with the volumes shown on the table...

    2. Determine the minimum cycle length for the intersection with the volumes shown on the table below. The intersection is designed to have the following three phases: Phase A for left-turn movements from the EB and WB approaches; Phase B for the through and right movements from the EB and WB approaches; Phase C serving all movements for the NB and SB approaches. EB approach WB approach N B approach SB approach LT RLT RL TRL TR 110 500 200...

  • 4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the...

    4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the Webster method. For each approach, assume one dedicated left-turn lane, one through lane, and one through-right lane North A South A h East A Left Tunm Through Movement Right Turn 135 415 138 162 559 167 West Approach 135 514 370 131 -PHF = 0.95 Left-turn factor 1.4 -Right-turn factor-1.0 -PCE for buses and trucks =1.6 -Truck percentage-3% for westbound traffic and zero otherwise...

  • 19-5 Traffic Engineering 5th edition Develop a signal timing for intersection: N/S 30 ft (1 lane NB/ 1 lane SB) E/W 85 ft ( 3 lanes EB/ 3 lanes WB...with separate left turn lane on EB and WB approach)...

    19-5 Traffic Engineering 5th edition Develop a signal timing for intersection: N/S 30 ft (1 lane NB/ 1 lane SB) E/W 85 ft ( 3 lanes EB/ 3 lanes WB...with separate left turn lane on EB and WB approach) Veh/hr EB: Left - 200, Through - 800, Right 120 WB: Left - 160, Through - 1050, right - 100 NB: Left - 10, Through - 420, right - 10 SB: Left - 12, Through 400, right - 8 PHF =...

  • Word Problem) Two two-way streets meet at an intersection controlled by a four-way traffic light. In...

    Word Problem) Two two-way streets meet at an intersection controlled by a four-way traffic light. In the east and west directions, the lights cycle from green to yellow to red. The south-facing lights do the same thing, except that they are red when the east-west lights are green or yellow, and vice versa. However, the north-facing lights are augmented with a green left turn arrow. They cycle red-green arrow-yellow arrow-green-yellow-red. Consider the following additional problem specifications: When the green or...

  • Show me the whole solution thank you so much :)

    1.    In a particularly long traffic light on your morning commute is green 30% of the time that you approach it. Assume that each morning represents an independent trial. What is the probability that the first morning that the light is not green is the sixth morning that you approach it?  

  • Please help with my car traffic simulator! Code that I already have below, I do not know how to...

    Please help with my car traffic simulator! Code that I already have below, I do not know how to start it off! public class IntersectionSimulation { private final static int EAST_WEST_GREEN_TIME = 30 ; private final static int[] NORTH_SOUTH_GREEN_TIMES = { 20, 24, 30, 42 } ; private final static int[] CAR_INTERSECTION_RATES = { 3, 5, 10 } ; private final static int[] CAR_QUEUEING_RATES = { 5, 10, 30 } ; private final static int[] EXPERIMENT_DURATIONS = { 3*60, 5*60,...

  • please help me to answer the question below thank you so much!! 2. Diisononyl phthalate (DINP)...

    please help me to answer the question below thank you so much!! 2. Diisononyl phthalate (DINP) is not a concern in children's toys because it is linked to the PVC molecules and will not leach out of an objecte TRUE or FALSE? (2 points) 3. In the Consumer Product Safety Commission's first risk assessment of DINP in children's toys the Commission found that the average infant (3-12 months of age) had exposures exceeding the Acceptable Daily Intake (ADI) TRUE or...

  • Hello, Please help me with the questions below. Thank you so much for your time. 2....

    Hello, Please help me with the questions below. Thank you so much for your time. 2. For an airplane during landing, an angle of approach is defined as the angle formed by the runway and the path of the aircraft as it approaches the runway. For a safe landing, pilots need to land the plane with an angle of approach between 2.7 and 4.0 degrees. Upon arrival at its destination, an airplane is at an elevation of 100 feet and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT