9. What were the company’s predetermined overhead rates in the Molding Department and the Fabrication Department?
10. How much manufacturing overhead was applied from the Molding Department to Job P and how much was applied to Job Q?
11. How much manufacturing overhead was applied from the Fabrication Department to Job P and how much was applied to Job Q?
12. If Job P included 20 units, what was its unit product cost?
13. If Job Q included 30 units, what was its unit product cost?
14. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for Job P and 30 units were produced for Job Q?
15. What was Sweeten Company’s cost of goods sold for March?
9. Predetermined overhead = Estimated total manufacturing overhead / Estimated machine hours
Molding department = $11,250+2,500*1.9 / 2,500 = $6.4 per machine hour
Fabrication department = $15,750+1,500*$2.7 / 1,500 = $13.2 per machine hour
10.
Molding department to Job P = 2,200*$6.4 = $14,080
Molding department to Job Q = 1,300*$6.4 = $8,320
11.
Fabrication department to Job P = 1,100*$13.2 = $14,520
Fabrication department to Job Q = 1,400*$13.2 = $18,480
12.
Job P unit product cost = Direct material+Direct labor+Manufacturing overhead applied / Units
Job P unit product cost = $18,000+25,000+14,080+14,520 / 20 = $3,580 per unit
13.
Job Q unit product cost = $10,500+9,500+8,320+18,480 / 30 = $1,560 per unit
14.
Job P | Job Q | |
Total cost | $71,600 | $46,800 |
Add: Markup@80% | 57,280 | 37,440 |
Selling price | 128,880 | 84,240 |
Units produced | 20 | 30 |
Selling per unit | $6,444 | $2,808 |
15.
Sweeten company cost of goods sold = $71,600+46,800 = $118,400
9. What were the company’s predetermined overhead rates in the Molding Department and the Fabrication Department?...
9. What were the company’s predetermined
overhead rates in the Molding Department and the Fabrication
Department? (Round your answers to 2 decimal
places.)
10. How much manufacturing overhead was applied from the Molding
Department to Job P and how much was applied to Job Q? (Do
not round intermediate calculations.)
11. How much manufacturing overhead was applied from the
Fabrication Department to Job P and how much was applied to Job Q?
(Do not round intermediate calculations.)
12. If Job...
9. What were the company’s predetermined
overhead rates in the Molding Department and the Fabrication
Department? (Round your answers to 2 decimal
places.)
10. How much manufacturing overhead was applied
from the Molding Department to Job P and how much was applied to
Job Q? (Do not round intermediate
calculations.)
11. How much manufacturing overhead was applied
from the Fabrication Department to Job P and how much was applied
to Job Q? (Do not round intermediate
calculations.)
12. If Job...
1. What were the company’s predetermined overhead rates in the
Molding Department and the Fabrication Department? (Round
your answers to 2 decimal places.)
2. How much manufacturing overhead was applied from the Molding
Department to Job P and how much was applied to Job Q? (Do
not round intermediate calculations.)
3. How much manufacturing overhead was applied from the
Fabrication Department to Job P and how much was applied to Job Q?
(Do not round intermediate calculations.)
4. What was...
1.What were the company’s predetermined overhead rates in the
Molding Department and the Fabrication Department? (Round
your answers to 2 decimal places.)
2.How much manufacturing overhead was applied
from the Molding Department to Job P and how much was applied to
Job Q? (Do not round intermediate
calculations.)
3. How much manufacturing overhead was applied from the
Fabrication Department to Job P and how much was applied to Job Q?
(Do not round intermediate calculations.)
4. What was the total...
1. What was the company’s plantwide predetermined overhead
rate?
1a. How much manufacturing overhead was applied to Job P and how
much was applied to Job Q? (Do not round intermediate
calculations.)
b. What was the total manufacturing cost assigned to Job P?
(Do not round intermediate calculations.)
2a. If Job P included 20 units, what was its unit product cost?
(Do not round intermediate calculations. Round your final
answer to nearest whole dollar.)
2b. What was the total manufacturing...
Questions:
1. What was the company’s plantwide predetermined overhead
rate?
2. How much manufacturing overhead was applied to Job P and how
much was applied to Job Q?
3. What was the total manufacturing cost assigned to Job P?
4. If Job P included 20 units, what was its unit product
cost?
5. What was the total manufacturing cost assigned to Job Q?
6. If Job Q included 30 units, what was its unit product
cost?
7. Assume that Sweeten...
1. what were the company's Predetermined OH rate in
the Molding and fabrication department?
2. how much MOH was applied from the Molding
Department to job P and how much was applied to job Q?
3. How much MOH was applied from the fabrication
department to Job P and how much was applied to Job Q?
4. What was the total MOH cost assigned to Job P?
5. If Job P included 20 units, what was its unit
product cost?...
10. How much manufacturing overhead was applied from the Molding
Department to Job P and how much was applied to Job Q? (Do
not round intermediate calculations.)
11. How much manufacturing overhead was applied from the
Fabrication Department to Job P and how much was applied to Job Q?
(Do not round intermediate calculations.)
12. If Job P included 20 units, what was its unit product cost?
(Do not round intermediate calculations.)
13. If Job Q included 30 units, what...