Part A. number of units to be produced to get the maximum profit

Creating the equation in linear programming:

x=number of units of model A

y=number of units of model B

z=number of units of model C

Maximize : z(Profit)= 125x+88y+78z

with the following constraints: x+y+z >= 1135

x+y+z <=1400

x<=750

y<=475

z<=315

x>=400

y>=250

z>=175

Solving through the innear programming we get

x=750 units: y= 475 units: z= 175 units

Total max profit =149200

Part B: Sensitivity analysis using the linear programming

Iteration-7 MinRatio C 125 88 78 oooooooo * x3 x3 s S2 S3 S4 S. So S, Sp 225 0 0 0 1 0 -1 0 0 0 1 1 350 0 0 0 0 0 1 0 0 1 0 0

Reduced cost or oppurtunity cost

For model A( 125$)= next best alternative profitwise is model B(88$)

For model B( 88$)= next best alternative profitwise is model A(125$)

For model C( 178$)= next best alternative profitwise is model A(125$)

Shawdow cost : for every unit lost in Model A we will loose contribution of $37 that is determined by Cj-Zj in the final optimal solution.

Part C.

Reduced cost or opputunity cost is determined to know the cost of loosing the next best alternative .

whereas shadow cost tell the lose of contribution for every production unit lost and thats how it gonna impact the profit stucture of the company.

Part D.

Now the profit is determined by keeping the Model A at maximum 750 units. so there wont be any change in the solution but when we use the resources used for model C for Model A its cost more by 10$ which is the Cjj-Zj of the S8 in the solution and over all profit would be 37$ for the model A - 10$ additinal cost . over all profit can be impacted by 27$

Note: As there are mulitple sub parts and there is no specific requirement given only the first 4 parts were answered.

Add a comment
Know the answer?
Add Answer to:
. Problem Two: Chelsea Furniture produces three lines of office chairs for corporate clients, model A,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A Furniture Company produces chairs and tables from two resources- labor and wood. The company has 125 hours of labor an...

    A Furniture Company produces chairs and tables from two resources- labor and wood. The company has 125 hours of labor and 45 board-ft. of wood available each day. Demand for chairs is limited to 5 per day. Each chair requires 7 hours of labor and 3.5 board-ft. of wood, whereas a table requires 14 hours of labor and 7 board-ft. of wood. The profit derived from each chair is $325 and from each table, $120. The company wants to determine...

  • ables from two resources-laborat h Solve LDS TUT The Pinewood Furniture Company produces chairs and tables...

    ables from two resources-laborat h Solve LDS TUT The Pinewood Furniture Company produces chairs and tables from two mnany has 80 hours of labor and 36 board-ft. of wood available each do for chairs is limited to 6 per day. Each chair requires 8 hours of labor and 2 board. whereas a table requires 10 hours of labor and 6 board-ft. of wood. The profit derived from chair is $400 and from each table, $100. The company wants to determine...

  • Part I: Multiple Choice 1. The Bamboo Furniture Company manufactures two main products, chairs and recreational...

    Part I: Multiple Choice 1. The Bamboo Furniture Company manufactures two main products, chairs and recreational tables, for use in summer homes and outdoor porched-in areas. The firm has two main resources: its carpenters (labor) and a supply of Bamboo for use in the furniture. During the next production cycle, 1,200 hours of labor are available under a union agreement. The firm also has a stock of 3,500 feet of good quality Bamboo. Each chair that Bamboo Furniture produces requires...

  • An Air Conditioning manufactures three varieties of home air conditioners: an economy model, a standard model,...

    An Air Conditioning manufactures three varieties of home air conditioners: an economy model, a standard model, and a deluxe model. The profit per unit is SAR 63, 95, and 135, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 200 fan motors, 320 cooling coils, and 2400 hours of manufacturing...

  • I need the answer to include solver and excel. Thank you. A Company produces two products....

    I need the answer to include solver and excel. Thank you. A Company produces two products. Relevant information for each product is shown in the Table below. The company has a goal of $48 in profits and incurs $1 penalty for each dollar it falls short of this goal. A total of 32 hours of labor are available. A $2 penalty is incurred for each hour of overtime (labor over 32 hours) used, and $1 penalty is incurred for each...

  • The question is: If the company adds an additional worker in the finishing department, what will...

    The question is: If the company adds an additional worker in the finishing department, what will happen? The question is: If the company adds an additional worker in the finishing department, what will happen? Multiple choice answer options are below. The answer is either A, B, C or D. A.) profit will increase by $120 B.) profit will increase by $20 C.) the optimal solution will not change D.) the company will produce 20 additional surfboards Beach Boys Surfers is...

  • Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $67, $93, and $129,...

    Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $67, $93, and $129, respectively. The production requirements per unit are as follows: Number of Manufacturing Number of Cooling Coils Time (hours) Fans Economy Standard 12 Deluxe 14 For the coming production period, the company has 250 fan motors, 360 cooling coils, and 1800 hours of manufacturing time available. How many economy models (E),...

  • Layton Machining Company (LMC) manufactures two versions of a basic machine tool. One version is a...

    Layton Machining Company (LMC) manufactures two versions of a basic machine tool. One version is a standard model and one is a custom model, which requires some additional work and slightly higher grade materials. The manufacturing process at LMC requires that each product go through two departments, Grinding and Finishing. The process in each department uses a single type of machine. Total machine capacity in Grinding is 50,000 hours, and in Finishing total machine capacity is 30,000 hours. (Each department...

  • Question 2: An oil company produces three brands of oil: regular, multigrade, and supreme. Each brand...

    Question 2: An oil company produces three brands of oil: regular, multigrade, and supreme. Each brand of oil is composed of one or more of four crude stocks, each having a different lubrication index. The relevant data concerning the crude stocks are as follows. Crude Stock Lubrication Index Cost/Barrel Daily Supply (Barrels) 20 40 30 7.10 8.50 7.70 9.00 1000 1100 1200 1100 3 Each brand of oil must meet a minimum standard for a lubrication index, and each brand...

  • The Martinez Model Car Company produces four different radio-controlled model cars based on exotic production models:...

    The Martinez Model Car Company produces four different radio-controlled model cars based on exotic production models: Ferrari, BMW, Lotus, and Tesla. Each model requires production in five departments: molding, sanding, polishing, painting, and finishing. The number of minutes required for each product in each department, the selling price per unit, and the minutes available in each department each day are shown below. Ferrari BMW Lotus Tesla Minutes Available Molding 5.00 3.50 1.00 3.00 600 Sanding 4.00 3.20 2.00 3.65 600...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT