Florex Company | |||||
Quality Cost Report | |||||
Last Year | This Year | ||||
Amount (In Thousands) | Percent of Sales | Amount (In Thousands) | Percent of Sales | ||
Prevention Cost | |||||
Quality Engineering | $420 | 0.50% | $630 | 0.75% | |
Statistical Process Control | 0 | 0.00% | $420 | 0.50% | |
System Development cost | $840 | 1.00% | $840 | 1.00% | |
Total Prevention Cost | $1,260 | 1.50% | $1,890 | 2.25% | |
Appraisals Cost | |||||
Inspection Cost | $630 | 0.75% | $756 | 0.90% | |
Depreciation of Testing Equipment | $588 | 0.70% | $210 | 0.25% | |
Supplies used in testing | $42 | 0.05% | $42 | 0.05% | |
Product Testing | $840 | 1.00% | $1,848 | 2.20% | |
Total Appraisals Cost | $2,100 | 2.50% | $2,856 | 3.40% | |
Internal Failure Cost | |||||
Rework Labor | $1,050 | 1.25% | $1,680 | 2.00% | |
Net Cost of scrap | $420 | 0.50% | $1,050 | 1.25% | |
Product Recalls | $2,940 | 3.50% | $840 | 1.00% | |
Disposals of defective Products | $630 | 0.75% | $420 | 0.50% | |
Total Internal Failure Cost | $5,040 | 6.00% | $3,990 | 4.75% | |
External Failure Cost | |||||
Cost of Field service | $1,260 | 1.50% | $1,176 | 1.40% | |
Warranty repairs | $3,780 | 4.50% | $1,512 | 1.80% | |
Total External Failure Cost | $5,040 | 6.00% | $2,688 | 3.20% |
Sales | 84000 | ||||
Florex Company |
|||||
Quality Cost Report | |||||
Last Year | This Year | ||||
Amount (In Thousands) | Percent of Sales | Amount (In Thousands) | Percent of Sales | ||
Prevention Cost | |||||
Quality Engineering | 420 | =C8/84000 | 630 | =F8/84000 | |
Statistical Process Control | 0 | =C9/84000 | 420 | =F9/84000 | |
System Development cost | 840 | =C10/84000 | 840 | =F10/84000 | |
Total Prevention Cost | =SUM(C8:C10) | =SUM(D8:D10) | =SUM(F8:F10) | =SUM(G8:G10) | |
Appraisals Cost | |||||
Inspection Cost | 630 | =C14/84000 | 756 | =F14/84000 | |
Depreciation of Testing Equipment | 588 | =C15/84000 | 210 | =F15/84000 | |
Supplies used in testing | 42 | =C16/84000 | 42 | =F16/84000 | |
Product Testing | 840 | =C17/84000 | 1848 | =F17/84000 | |
Total Appraisals Cost | =SUM(C14:C17) | =SUM(D14:D17) | =SUM(F14:F17) | =SUM(G14:G17) | |
Internal Failure Cost | |||||
Rework Labour | 1050 | =C21/84000 | 1680 | =F21/84000 | |
Net Cost of scrap | 420 | =C22/84000 | 1050 | =F22/84000 | |
Product Recalls | 2940 | =C23/84000 | 840 | =F23/84000 | |
Disposals of defective Products | 630 | =C24/84000 | 420 | =F24/84000 | |
Total Internal Failure Cost | =SUM(C21:C24) | =SUM(D21:D24) | =SUM(F21:F24) | =SUM(G21:G24) | |
External Failure Cost | |||||
Cost of Field service | 1260 | =C28/84000 | 1176 | =F28/84000 | |
Warranty repairs | 3780 | =C29/84000 | 1512 | =F29/84000 | |
Total External Failure Cost | =SUM(C28:C29) | =SUM(D28:D29) | =SUM(F28:F29) | =SUM(G28:G29) |
Problem 1A-4 Quality Cost Report [LO1-7, LO1-8] In response to intensive foreign competition, the management of...
In response to Intensive foreign competition, the management of Florex Company has attempted over the past year to Improve the quality of its products. A statistical process control system has been Installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below. Inspection Quality engineering Depreciation of test equipment...
In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below. Year Costs in thousands) Last This Year...
Thank you! In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below. Year Costs in thousands) Last...
In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below: Inspection Quality engineering Depreciation of test equipment...
In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years, Costs relating to quality and quality control over the last two years are given below: Inspection Quality engineering Depreciation of test equipment...
Check my work In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below: Costs (in thousands) Last...
If you can't see right click and open in new tab. I really don't understand how to find Percentage of sales. In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amoun of warranty and other field costs, which have been trending upward over the past several years. Costs...
In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below: Sales have been flat over the past...
Interim Quality Performance Report Davis, Inc., had the following quality costs for the years ended December 31, 2014 and 2015: 2014 2015 Prevention costs: Quality audits $62,000 $93,000 Vendor certification 126,500 189,750 Appraisal costs: Product acceptance $86,000 $129,000 Process acceptance 95,000 105,000 Internal failure costs: Retesting $90,000 $88,000 Rework 173,000 230,000 External failure costs: Recalls $130,000 $104,000 Warranty 310,000 318,000 At the end of 2014, management decided to increase its investment in control costs by 50 percent for each category’s...
Interim Quality Performance Report Davis, Inc., had the following quality costs for the years ended December 31, 20x4 and 20x5: 20x4 20x5 Prevention costs: Quality audits $71,000 $106,500 Vendor certification 124,500 186,750 Appraisal costs: Product acceptance $93,000 $139,500 Process acceptance 85,000 107,500 Internal failure costs: Retesting $108,000 $90,000 Rework 200,000 188,000 External failure costs: Recalls $135,000 $108,000 Warranty 315,000 318,000 At the end of 20x4, management decided to increase its investment in control costs by 50 percent for each category’s...