Product unit are produced at the rate of 3 units per useful direct labour hour. Direct labour idle time is 10% of hour paid for. Sales of 500 units are planned and finished goods stock is budget to rise by 40 units. Which of the following is direct labour budget (hours)
Group of answer choices
162
200 hours
2000
1620
Answer : 200 hours
Calculated as
Sale of units = 500
Ending units = 40
Production required = 500+40 = 540
Hours required = 540/3 = 180 hours
So total hours required = 180 * 100/90 = 200 hours
Product unit are produced at the rate of 3 units per useful direct labour hour. Direct...
Weaver Company's predetermined overhead rate is $17.00 per direct labour-hour, and its direct labour wage rate is $11.00 per hour. The following information pertains to Job A-200: Direct materials Direct labour $120 $110 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Average cost per unit
The actual cost of direct labour per hour is $13.00. Two standard direct labour hours are allowed per finished good. During the current period, 2,000 finished goods were produced using 3,800 direct labour hours. The direct labour efficiency variance is $1,300, favourable. Which one of the following amounts is the standard direct labour rate per hour for the period?. A. $6.50 B. $10.00 C. $13.00 D. $26.00
Weaver Company’s predetermined overhead rate is $15.00 per direct labour-hour, and its direct labour wage rate is $10.00 per hour. The following information pertains to Job A-200: Direct materials $315 Direct labour $210 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Score answer Visit question map Question 1 of 2 Total
Weaver Company’s predetermined overhead rate is $15.00 per direct labour-hour, and its direct labour wage rate is $10.00 per hour. The following information pertains to Job A-200: Direct materials $315 Direct labour $210 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Score answer Visit question map Question 1 of 2 Total
Weaver Company’s predetermined overhead rate is $20.00 per direct labour-hour, and its direct labour wage rate is $15.00 per hour. The following information pertains to Job A-200: Direct materials $240 Direct labour $180 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 55 units, what is the average cost assigned to each unit included in the job?
The production department of Zan Corporation has submitted the following forecast of units to be produced by quarter for the upcoming fiscal year: 1st Units to be produced Quarter 5,200 2nd Quarter 8,200 3rd Quarter 7,209 4th Quarter 6,200 In addition, 6,200 grams of raw materials inventory is on hand at the start of the 1st quarter and the beginning accounts payable for the 1st quarter is $3,080. Each unit requires 8.20 grams of raw material that costs $1.60 per...
Derf Company allocates overhead on the basis of direct labour hours. Two direct labour hours are required for each unit of product. Planned production for the period was set at 9000 units. Manufacturing overhead is estimated at $135,000 for the period (20 per cent of this cost is fixed). The 17,200 hours worked during the period resulted in the production of 8500 units. Variable manufacturing overhead cost incurred was $108,500 and the fixed manufacturing overhead cost was $28,000. Required(a) Determine the...
Exercise 5-2 Computing Job Costs [LO2] Weaver Company's predetermined overhead rate is $15.00 per direct labour-hour, and its direct labour wage rate is $10.00 per hour. The following information pertains to Job A-200: $405 Direct materials Direct labour $270 Required: 1. What is the total manufacturing cost assigned to Job A-2002 Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Average cost per unit
Carera Corporation uses a predetermined overhead rate of $23.70 per direct labour-hour. This predetermined rate was based on 13,700 estimated direct labour-hours and $324,690 of estimated total manufacturing overhead. The company incurred actual total manufacturing overhead costs of $309,260 and 14,300 total direct labour-hours during the period. Required: Determine the amount of manufacturing overhead applied to units of product during the period as well as the amount of over- or underapplied overhead for the period.
Recording Standards in Accounts The Assembly Department produced 3,000 units of product during March. Each unit required 1.25 standard direct labor hours. There were 4,000 actual hours used in the Assembly Department during March at an actual rate of $13.5 per hour. The standard direct labor rate is $14.5 per hour. Assuming direct labor for a month is paid on the fifth day of the following month, journalize the direct labor in the Assembly Department on March 31. For a...