The document that lists the total cost for a single job is
a job-order cost sheet.
materials requisition form.
time ticket.
purchase order.
None of these are correct.
A. a job-order cost sheet.
The document that lists the total cost for a single job is a job-order cost sheet.
The document that lists the total cost for a single job is a job-order cost sheet....
The cost of direct materials is assigned to a job by the use of a source document known as a time ticket schedule of cost of goods manufactured sales receipt O materials requisition form All of these choices are correct
1. LO 41 Which of the following product situations is better suited to job order costing than to process conting? A Each product batch is exactly the same as the prior batch B. The costs are easily traced to a specific product. C. Costs are accumulated by department D. The value of work in process is based on assigning standard costs. 2. LO 41 A job order costing system is most likely used by which of the following? A. a...
Job Order Cost Sheet Remnant Carpet Company sells and installs commercial carpeting for office buildings. Remnant Carpet Company uses a job order cost system. When a prospective customer asks for a price quote on a job, the estimated cost data are inserted on an unnumbered job cost sheet. If the offer is accepted, a number is assigned to the job, and the costs incurred are recorded in the usual manner on the job cost sheet. After the job is completed,...
Source Documents and Cost Flows in Job-Order Costing In job-order costing, the individual costs of each job must be kept track of separately. The costs of each job are kept track of on a job-order cost sheet. The job-order cost sheets are subsidiary records to the account. Each job order cost sheet includes the unique name assigned to the job (e.g., Smith House for a construction firm, or 2014-001 for the first job of 2014 for a custom framing shop)....
Job Cost Sheet Remnant Carpet Company sells and installs commercial carpeting for office buildings. Remnant Carpet Company uses a job order cost system. When a prospective customer asks for a price quote on a job, the estimated cost data are inserted on an unnumbered job cost sheet. If the offer is accepted, a number is assigned to the job, and the costs incurred are recorded in the usual manner on the job cost sheet. After the job is completed, reasons...
Job Cost Sheet Remnant Carpet Company sells and installs commercial carpeting for office buildings. Remnant Carpet Company uses a job order cost system. When a prospective customer asks for a price quote on a job, the estimated cost data are inserted on an unnumbered job cost sheet. If the offer is accepted a number is assigned to the job, and the costs incurred are recorded in the usual manner on the job cost sheet. After the job is completed, reasons...
3. A document that lists the type and quantity of each type of direct material needed to make a product: a. Job order costing b. Bill of materials c. Absorption costing d. Job cost sheet
Job Cost Sheet Remnant Carpet Company sells and installs commercial carpeting for office buildings. Remnant Carpet Company uses a job order cost system. When a prospective customer asks for a price quote on a job, the estimated cost data are inserted on an unnumbered job cost sheet. If the offer is accepted, a number is assigned to the job, and the costs incurred are recorded in the usual manner on the job cost sheet. After the job is completed, reasons...
A job cost sheet of Ivanhoe Company is given below. JOB NO. 469 Job Cost Sheet Quantity White Lion Cages Date Requested Todd Company Date Completed Direct Direct Materials Labor FOR 2.500 7/2 7/31 Manufacturing Overhead Date 7/10 700 900 400 1,675 1,575 Cost of completed job: Direct materials Direct labor Manufacturing overhead Total cost Unit cost Your answer is partially correct. Try again. Answer the following questions. (1) What are the source documents for direct materials, direct labor, and...
Exercise 15-2 Job cost computation LO C2 The following information is from the materials requisitions and time tickets for Job 9-1005 completed by Great Bay Boats. The requisitions are identified by code numbers starting with the letter Q, and the time tickets start with W. At the start of the year, management estimated that overhead cost would equal 110% of direct labor cost for each job. Date 7/ 1 7/1 7/ 5 7/ 5 7/10 Document Amount -4698 $2,000 W-3393...