Weaver Company's predetermined overhead rate is $19.00 per direct labor-hour and its direct labor wage rate...
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $230 $195 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $240 $60 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 80 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A- 200: Direct materials Direct labor $250 $130 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost $ 385 2. If Job A-200 consists of 70 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average...
Weaver Company's predetermined overhead rate is $24.00 per direct labor-hour and its direct labor wage rate is $16.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $230 $160 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 60 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $250 $240 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit...
Weaver Company's predetermined overhead rate is $17.00 per direct labour-hour, and its direct labour wage rate is $11.00 per hour. The following information pertains to Job A-200: Direct materials Direct labour $120 $110 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Average cost per unit
Weaver Company’s predetermined overhead rate is $20.00 per direct labour-hour, and its direct labour wage rate is $15.00 per hour. The following information pertains to Job A-200: Direct materials $240 Direct labour $180 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 55 units, what is the average cost assigned to each unit included in the job?
Weaver Company’s predetermined overhead rate is $15.00 per direct labour-hour, and its direct labour wage rate is $10.00 per hour. The following information pertains to Job A-200: Direct materials $315 Direct labour $210 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Score answer Visit question map Question 1 of 2 Total
Mickley Company's plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $15.00 per hour. The following information pertains to Job A-500: $ 290 $ 225 Direct materials Direct labor Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 70 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost Unit product cost 2....
Weaver Company’s predetermined overhead rate is $15.00 per direct labour-hour, and its direct labour wage rate is $10.00 per hour. The following information pertains to Job A-200: Direct materials $315 Direct labour $210 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Score answer Visit question map Question 1 of 2 Total