1) Total manufacturing cost assigned to Job A-200
Direct material | 240 |
Direct labor | 60 |
Overhead (60/12*23) | 115 |
Total manufacturing cost | 415 |
2) Average cost = 415/80 = 5.19 per unit
Weaver Company's predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate...
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $250 $240 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit...
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $230 $195 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A- 200: Direct materials Direct labor $250 $130 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost $ 385 2. If Job A-200 consists of 70 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average...
Weaver Company's predetermined overhead rate is $24.00 per direct labor-hour and its direct labor wage rate is $16.00 per hour. The following information pertains to Job A-200: Direct materials Direct labor $230 $160 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 60 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $19.00 per direct labor-hour and its direct labor wage rate is $15.00 per hour The following information pertains to Job A-200 Direct materals Direct labor $290 $300 Required 1. What is the total manufacturing cost assigned to Job A-200 2 If Job A-200 consists of 00 unts, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places) per unt
Mickley Company's predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $15.00 per hour. The following information pertains to Job A-500: Direct materials Direct labor $220 $150 Required: 1. What is the total manufacturing cost assigned to Job A-500? Total manufacturing cost 2. If Job A-500 consists of 60 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Weaver Company's predetermined overhead rate is $17.00 per direct labour-hour, and its direct labour wage rate is $11.00 per hour. The following information pertains to Job A-200: Direct materials Direct labour $120 $110 Required: 1. What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2. If Job A-200 consists of 40 units, what is the average cost assigned to each unit included in the job? Average cost per unit
Weaver Company’s predetermined overhead rate is $20.00 per direct labour-hour, and its direct labour wage rate is $15.00 per hour. The following information pertains to Job A-200: Direct materials $240 Direct labour $180 Required: 1. What is the total manufacturing cost assigned to Job A-200? 2. If Job A-200 consists of 55 units, what is the average cost assigned to each unit included in the job?
Mickley Company's plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-500: Direct materials Direct labor $ 270 $ 260 Required 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 60 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost...
Mickley Company's plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $11.00 per hour. The following Information pertains to Job A-500: Direct materials $290 Direct labor $ 220 Requlrecd 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 60 units, what is the unit product cost for this job? (Round your answer to 2 declmal places.) 1. Total manufacturing cost 2. Unit product cost per...