Question

Overhead information for Cran-Mar Company for October follows: $16,500 $4,900 Total factory overhead cost incurred Budgeted fEXHIBIT 15.7 Schmidt Machincry Company, Factory Ovcrhcad Variance Analyscs, Oetober 2019 Panel 1: Four-Variance Analysis StanEXHIBIT 15.6 General Model: Four-Variance Analysis of Total Factory Overhead Cost Variance (B) (C) (A) (D) Flexible Budget Fl

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer is given below

1 $4.99 Standard fixed overhead rate Total Standard OH rate per MH Standard variable OH rate Standard fixed overhead rate $3.

Add a comment
Know the answer?
Add Answer to:
Overhead information for Cran-Mar Company for October follows: $16,500 $4,900 Total factory overhead cost incurred Budgeted...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Overhead information for Cran-Mar Company for October follows: Total factory overhead cost incurred Budgeted fixed factory...

    Overhead information for Cran-Mar Company for October follows: Total factory overhead cost incurred Budgeted fixed factory overhead cost Total standard overhead rate per machine hour (MH) Standard variable factory overhead rate per MH Standard MHS allowed for the units manufactured $16,500 $ 4,900 $ 4.99 $ 3.90 4,700 Required: 1. What is the standard fixed factory overhead rate per machine hour (MH)? 2. What is the denominator activity level that was used to establish the fixed factory overhead application rate?...

  • Under a two-variance breakdown (decomposition) of the total factory overhead variance, the fixed overhead production volume...

    Under a two-variance breakdown (decomposition) of the total factory overhead variance, the fixed overhead production volume variance, to the nearest whole dollar, is: Multiple Choice $400 favorable. $600 unfavorable. $1,400 favorable. $1,400 unfavorable. $2,000 favorable. b. Under a two-variance breakdown (decomposition) of the total factory overhead variance, the total flexible-budget variance, to the nearest whole dollar, is: Multiple Choice $400 favorable. $600 unfavorable. $1,400 favorable. $1,400 unfavorable. $2,000 favorable. The following information for the past year is available from Thinnews...

  • The difference between the total actual overhead cost incurred during a period and budgeted total factory...

    The difference between the total actual overhead cost incurred during a period and budgeted total factory overhead cost for the actual quantity of the cost driver used to apply overhead is equal to the: Multiple Choice A: Total overhead spending variance. B: Total overhead efficiency variance. C: Factory overhead production-volume variance. D: Total overhead rate variance. E: Total overhead variance.

  • The following information is available from the Terry Company: Actual total factory overhead cost incurred $...

    The following information is available from the Terry Company: Actual total factory overhead cost incurred $ 37,000 Actual fixed overhead cost incurred $ 11,200 Budgeted fixed overhead expenses $ 21,000 Actual direct labor hours (DLH) worked 5,300 Standard DLHs for this period’s production (output) 4,800 Standard variable overhead rate per DLH $ 3.00 Standard fixed overhead rate per DLH $ 2.50 What is the total overhead spending variance for Terry Company for the period, to the nearest whole dollar? $100...

  • Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity i...

    Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity is defined as 26 setups and 26,000 machine hours to manufacture 6,500 units for the year. Selected data for 2019 follow Budgeted fixed factory overhead: $ 54,600 178,000 Setup cost Other $232,600 $481,000 Total factory overhead cost incurred Variable factory overhead rate: $ 400 $6.00 30,000 34,500 Per setup Per machine hour Total standard machine hours allowed for the units manufactured Machine hours actually worked Actual total number...

  • The total factory overhead spending variance in 2019 (to the nearest whole dollar), based on a...

    The total factory overhead spending variance in 2019 (to the nearest whole dollar), based on a three-variance breakdown (decomposition) of the total overhead variance for Bluecap Co., was: Multiple Choice $3,200 favorable. $11,440 unfavorable. $15,040 favorable. $17,280 favorable. $17,440 unfavorable. Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: Denominator volume-number of units Denominator volume-percent of capacity Denominator volume-standard direct labor hours (DLHS) Budgeted variable factory overhead cost at...

  • Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity is defined as 32...

    Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity is defined as 32 setups and 32,000 machine hours to manufacture 6,400 units for the year. Selected data for 2019 follow: $ 102,400 174,000 $276,400 $496,000 Budgeted fixed factory overhead: Setup cost Other Total factory overhead cost incurred Variable factory overhead rate: Per setup Per machine hour Total standard machine hours allowed for the units manufactured Machine hours actually worked Actual total number of setups Actual number of...

  • Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity is defined as 28...

    Alden Company uses a three-variance analysis for factory overhead variances. Practical capacity is defined as 28 setups and 28,000 machine hours to manufacture 5,600 units for the year. Selected data for 2019 follow: Budgeted fixed factory overhead: Setup cost $ 84,000 Other 186,000 $ 270,000 Total factory overhead cost incurred $ 490,000 Variable factory overhead rate: Per setup $ 850 Per machine hour $ 5.00 Total standard machine hours allowed for the units manufactured 25,000 hours Machine hours actually worked...

  • Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of...

    Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 7,000 computers: Actual: Variable factory overhead $181,600 Fixed factory overhead 57,750 Standard: 7,000 hrs. at $32 224,000 If productive capacity of 100% was 11,000 hours and the total factory overhead cost budgeted at the level of 7,000 standard hours was $245,000, urs and the total factory overhead cost budgeted at the level of 7,000 standard hours was $245,000, determine the variable factory overhead controllable...

  • Patel and Sons Inc. uses a standard cost system to apply factory overhead costs to units...

    Patel and Sons Inc. uses a standard cost system to apply factory overhead costs to units produced. Practical capacity for the plant is defined as 52,200 machine hours per year, which represents 26,100 units of output. Annual budgeted fixed factory overhead costs are $261,000 and the budgeted variable factory overhead cost rate is $2.70 per unit. Factory overhead costs are applied on the basis of standard machine hours allowed for units produced. Budgeted and actual output for the year was...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT