Question

Examples (2) In a painting shop, on average, there are 5 defects on the body of a painted car. Calculate a) the probability of finding a painted body with 10 defects. b) the probability of finding 10 defects on 2 painted bodies.PLEASE SHOW ALL WORK

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Let X denotes the number of defects on the body of a randomly selected painted car.

X ~ Poisson(5)

The probability mass function of X is

e * 5 r 0,1,2,3,

a) The probability of finding a painted body with 10 defects

-54 510 P(X 10) 10 0.0181328

b)

Let Y denotes the number of defects on the body of 2 randomly selected painted car.

Y ~ Poisson(5 + 5) or Y ~ Poisson(10)

The probability mass function of Y is

e-10 * 10*

The probability of finding 10 defects on 2 painted bodies

e-10 101 =0.125 110 101

Add a comment
Know the answer?
Add Answer to:
PLEASE SHOW ALL WORK Examples (2) In a painting shop, on average, there are 5 defects...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • PLEASE SHOW ALL WORK Examples (1) In a welding process, 10 different points of a battery...

    PLEASE SHOW ALL WORK Examples (1) In a welding process, 10 different points of a battery tab are welded. If the probability of making an acceptable weld is 0.99, calculate: a) the probability of making a battery tab with 6 failed welds. b) the probability of making a battery with at least 2 failed welds.

  • PLEASE SHOW ALL WORK Examples In a welding process, probability of making an acceptable weld is...

    PLEASE SHOW ALL WORK Examples In a welding process, probability of making an acceptable weld is 0.99, calculate the probability of making at least 5 welds until a defective weld is made.

  • . The operation manager of a body and paint shop has five cars to schedule for...

    . The operation manager of a body and paint shop has five cars to schedule for repair. He would like to minimize throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are listed below. (a) Determine the job sequence using the Johnson rule. (b) How much idle time is related to painting? (use a chart to find...

  • 3. The operation manager of a body and paint shop has five cars to schedule for...

    3. The operation manager of a body and paint shop has five cars to schedule for repair. He would like to minimize throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are listed below. Car Body Work (Hours) Paint (Hours) JA 12 B 17 6 14 10 C 19 D 3 E 12 4 5 (a) Determine...

  • 3. The operation manager of a body and paint shop has five cars to schedule for...

    3. The operation manager of a body and paint shop has five cars to schedule for repair. He would like to minimize throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are listed below. Car А B с D E Body Work (Hours) 12 7 9 3 12 Paint (Hours) 6 4 10 4 5 (a) Determine...

  • Please show work for all points In order to get a full credit, you need to...

    Please show work for all points In order to get a full credit, you need to show all work. 1) An octahedron is a solid with eight faces. Each face is shaped like a triangle with four faces a "1" is painted. On three faces a "3" is painted. And, on one face a "5" is painted. The experiment consists of tossing the solid twice, and X is the sum of the numbers on the top face each time. a)...

  • 3. The operation manager of a body and paint shop has five cars to schedule for...

    3. The operation manager of a body and paint shop has five cars to schedule for repair. He would like to minimize throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are listed below. Paint (Hours) 6 Car A B C D E Body Work (Hours) 12 7 9 4 10 4 3 12 in (a) Determine...

  • Please show all work and steps! 2. Suppose that 52% of the customers of a particular...

    Please show all work and steps! 2. Suppose that 52% of the customers of a particular car dealership are men and the remaining 48% are women. The marketing office wants to be able to predict the gender of individual buyers. You know from historical data at the dealership that 5% of male buyers choose Trim Package l and that 10% of female buyers choose Trim Package l when buying a new car from your dealership. Given that a new car...

  • PLEASE SHOW ALL WORK Examples An oil company conducts a geological study that indicates that an...

    PLEASE SHOW ALL WORK Examples An oil company conducts a geological study that indicates that an exploratory oil well should have a 20% chance of striking oil. What is the probability that the third strike comes on the seventh well drilled?

  • This supposed to be Accounting Question please. Kindly redirect QUESTION TWO A. Fiifi Auto mobile company...

    This supposed to be Accounting Question please. Kindly redirect QUESTION TWO A. Fiifi Auto mobile company manufactures cars and trucks. Each vehicle must be processed in the paint shop and body assembly shop. If the paint shop were only painting trucks, then 80 per day could be painted. If the paint shop were only painting cars, then 120 per day could be painted. If the body shop were only producing cars, then it could process 100 per day. If the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT