The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours.
Please use the following information about the Blue Company;
Assembly Department Fabrication Department
Total fixed manufacturing overhead cost estimated
for all jobs during the whole year $480,000 $560,000
Estimated direct labor hours for all jobs during the whole year 80,000 60,000
Estimated machine hours for all jobs during the whole year 20,000 70,000
Estimated variable manufacturing overhead cost per direct labor hour $9 ------
Estimated variable manufacturing overhead cost per machine hour ----- $6
The following data is for Job 589:
Assembly Department Fabrication Department
Direct materials cost $400 $600
Direct labor cost $900 $300
Direct labor hours used 70 20
Machine hours used 30 50
Please calculate for Job 589:
a. the total direct materials cost
b. the total direct labor cost
c. The predetermined overhead rate for the Assembly department
d. The predetermined overhead rate for the Fabrication department
e. The manufacturing overhead cost applied to job 589 by the Assembly department
f. The manufacturing overhead cost applied to job 589 by the Fabrication department
g. The total manufacturing overhead cost applied to job 589
h. The total cost of job 589
i. The cost per unit (per boat)
a) Total direct material cost = 400+600 = 1000
b) Total direct labor cost = 900+300 = 1200
c) Predetermine overhead rate for the assembly = (480000/80000+9) = 15 per DLH
d) Predetermine overhead rate for the Fabrication = (560000/70000+6) = 14 per MH
e) Total manufacturing overhead cost applied to Job 589 by the Assembly department = 70*15 = $1050
f) Total manufacturing overhead cost applied to Job 589 by the Fabrication department = 50*14 = 700
g) Total manufacturing overhead cost applied to Job 589 = 1050+700 = $1750
h) Total cost of Job 589 = 1000+1200+1750 = 3950
i) The cost per unit = 3950/10 = $395
The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2...
2. The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours. Please use the following information about the Blue Company; Assembly Department Fabrication Department Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 $560,000 Estimated direct labor hours for...
1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company: Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 Estimated direct labor hours for all jobs during the whole year 60,000 Estimated variable manufacturing overhead cost per direct labor hour $3 Calculate the following if the Green Company uses...
The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour. Total manufacturing overhead cost expected for all jobs during the whole year in the Machining department $160,000 Estimated machine hours for all jobs during the whole year in the Machining department 8,000 Estimated direct labor hours for all jobs during the whole...
Assume a company has two manufacturing departments - Assembly and Fabrication. The company considers all of its manufacturing overhead costs to be fixed costs. The first set of data below is budgeted data for the company as a whole that was estimated at the beginning of the year. The second set of data below is actual data for the company as a whole that was derived at the end of the year. The third set of data relates to one...
The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour. Total cost for all jobs Total amount of activity for all jobs Type of manufacturing overhead for the whole year for the whole year Setup Cost $50,000 400 setups Materials Handling 320,000 16,000 moves Electricity 30,000 6,000 machine hours _______ Total manufacturing...
1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company: Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 Estimated direct labor hours for all jobs during the whole year 60,000 Estimated variable manufacturing overhead cost per direct labor hour $3 Calculate the following if the Green Company uses...
Assume a company started and completed numerous jobs during July—two of which were Job Y and Job Z. The company uses two departmental predetermined overhead rates. The rate in the Machining Department is based on machine-hours and the rate in the Assembly Department is based on direct labor-hours. The following additional information from the month of July is available for the company as a whole and for Jobs Y and Z: Machining Assembly Estimated total fixed manufacturing overhead $ 48,000...
Assume a company has two manufacturing departments - Assembly and Fabrication. The company considers all of its manufacturing overhead costs to be fixed costs. The first set of data below is budgeted data for the company as a whole that was estimated at the beginning of the year. The second set of data below is actual data for the company as a whole that was derived at the end of the year. The third set of data relates to one...
Landen Corporation uses a job-order costing system. At the beginning of the year, the company made the following estimates: Direct labor-hours required to support estimated production Machine-hours required to support estimated production Fixed manufacturing overhead cost Variable manufacturing overhead cost per direct labor-hour Variable manufacturing overhead cost per machine-hour 140,000 70,000 $ 784,000 $ 2.00 $ 4.00 During the year, Job 550 was started and completed. The following information is available with respect to this job: Direct materials Direct labor...
Hahn Company uses a job-order costing system. Its plantwide predetermined overhead rate uses direct labor-hours as the allocation base. The company pays its direct laborers $15 per hour. During the year, the company started and completed only two jobs—Job Alpha, which used 54,500 direct labor-hours, and Job Omega. The job cost sheets for the these two jobs are shown below: Job Alpha Direct materials Direct labor Manufacturing overhead applied Total job cost 2 ? $1,533,500 Job Omega Direct materials Direct...