Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour.
Total manufacturing overhead cost expected
for all jobs during the whole year in the Machining department $160,000
Estimated machine hours for all jobs during the whole year
in the Machining department 8,000
Estimated direct labor hours for all jobs during the whole year
in the Machining department 10,000
Total manufacturing overhead cost expected
for all jobs during the whole year in the Assembly department $240,000
Estimated machine hours for all jobs during the whole year
in the Assembly department 16,000
Estimated direct labor hours for all jobs during the whole year
in the Assembly department 30,000
Calculate the following if the Green Company uses a different predetermined overhead rate for each department. In the Machining department the predetermined overhead rate uses machine hours as the allocation base, while in the Assembly department the predetermined overhead rate uses direct labor hours as the allocation base:
The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459...
The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour. Total cost for all jobs Total amount of activity for all jobs Type of manufacturing overhead for the whole year for the whole year Setup Cost $50,000 400 setups Materials Handling 320,000 16,000 moves Electricity 30,000 6,000 machine hours _______ Total manufacturing...
1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company: Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 Estimated direct labor hours for all jobs during the whole year 60,000 Estimated variable manufacturing overhead cost per direct labor hour $3 Calculate the following if the Green Company uses...
The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours. Please use the following information about the Blue Company; Assembly Department Fabrication Department Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 $560,000 Estimated direct labor hours for...
2. The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours. Please use the following information about the Blue Company; Assembly Department Fabrication Department Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 $560,000 Estimated direct labor hours for...
1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company: Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 Estimated direct labor hours for all jobs during the whole year 60,000 Estimated variable manufacturing overhead cost per direct labor hour $3 Calculate the following if the Green Company uses...
Walker Enterprises, Inc., uses a job-order costing system and sets a predetermined overhead rate at the beginning of each year based on estimated manufacturing overhead costs. Each job requires work in both the Assembly and Machining Departments. The predetermined overhead rate is based on direct labor cost in Assembly Department and on machine hours in Machining Department. At the beginning of the year, the company made the following estimates: Assembly Department $120,000 Machining Department $32,000 Direct labor cost Manufacturing overhead...
Mason Company has two manufacturing departments-Machining and Assembly. The company considers all of its manufacturing overhead costs to be fixed costs. It provided the following estimates at the beginning of the year as well as the following information with respect to Jobs A and B: Estimated Data Manufacturing overhead Direct labor hours Machine hours Machining $1,352,000 13,000 104,000 Assembly $ 169,000 104,000 8,000 Total $1,521,000 117,000 112,000 Job A Direct labor hours Machine hours Machining Assembly Total 1 12 13...
Mason Company has two manufacturing departments-Machining and Assembly. The company considers all of its manufacturing overhead costs to be fixed costs. It provided the following estimates at the beginning of the year as well as the following information with respect to Jobs A and B: Estimated Data Manufacturing overhead Direct labor hours Machine hours Machining $22.500.000 30,000 750,000 Assembly $ 900.000 750,000 25,000 Total $23.400.000 780,000 775,000 JobA Direct labor hours Machine hours Machining Assembly 10 Total 15 Machining Assembly...
Mason Company has two manufacturing departments—Machining and Assembly. The company considers all of its manufacturing overhead costs to be fixed costs. It provided the following estimates at the beginning of the year as well as the following information with respect to Jobs A and B: Mason Company has two manufacturing departments-Machining and Assembly. The company considers all of its manufacturing overhead costs to be fixed costs. It provided the following estimates at the beginning of the year as well as...
Mason Company has two manufacturing departments-Machining and Assembly. The company considers all of its manufacturing overhead costs to be fixed costs. It provided the following estimates at the beginning of the year as well as the following information with respect to Jobs A and B: Estimated Data Manufacturing overhead Direct labor hours Machine hours Machining $9,522,000 23,000 414,000 Assembly $529,000 414,000 18,000 Total $10,051,000 437,000 432,000 Machining Assembly Total Job A Direct labor hours Machine hours 11 2 13 Machining...