1. The Green Company makes tables. Job 489 is to build 20 tables.

Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company:

Total fixed manufacturing overhead cost estimated for all jobs during the whole year     $480,000                                   

Estimated direct labor hours for all jobs during the whole year                                                  60,000   

Estimated variable manufacturing overhead cost per direct labor hour                                          $3                                     

Calculate the following if the Green Company uses the traditional method of job order costing with one company-wide predetermined overhead rate using direct labor hours as the allocation base:

a. The predetermined overhead rate

b. The manufacturing overhead cost applied to job 489

c. The total cost of job 489

d. The cost per unit (per table)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

a) Predetermine overhead rate = (480000/60000+3) = 11 per labor hour

b) Manufacturing overhead applied = 30*11 = 330

c) Total cost of Job 489

Direct material 680
Direct labor 530
Overhead 330
Total cost of Job 489 1540

d) The cost per unit = 1540/20 = $77

Add a comment
Know the answer?
Add Answer to:
1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires...

    1. The Green Company makes tables. Job 489 is to build 20 tables. Job 489 requires $680 of direct materials and 30 hours of direct labor costing $530. Also use the following information about the company: Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 Estimated direct labor hours for all jobs during the whole year 60,000 Estimated variable manufacturing overhead cost per direct labor hour $3 Calculate the following if the Green Company uses...

  • The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459...

    The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour. Total manufacturing overhead cost expected           for all jobs during the whole year in the Machining department               $160,000    Estimated machine hours for all jobs during the whole year               in the Machining department                                                                             8,000    Estimated direct labor hours for all jobs during the whole...

  • The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459...

    The Green Company makes boats from wood. Job 459 is to build 40 rowboats. Job 459 requires 1,000 pounds of wood costing $8 per pound. It requires 60 hours of direct labor costing $25 per hour.                                                                Total cost for all jobs        Total amount of activity for all jobs Type of manufacturing overhead      for the whole year                      for the whole year Setup Cost                                                        $50,000                                 400 setups Materials Handling                                         320,000                           16,000 moves Electricity                                                           30,000                             6,000 machine hours                                                                           _______ Total manufacturing...

  • The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2...

    The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours. Please use the following information about the Blue Company;                                                                                                     Assembly Department     Fabrication Department Total fixed manufacturing overhead cost estimated for all jobs during the whole year                                                           $480,000                         $560,000 Estimated direct labor hours for...

  • 2. The Blue Company makes boats. Job 589 is to build 10 boats. The company has...

    2. The Blue Company makes boats. Job 589 is to build 10 boats. The company has 2 departments – assembly and fabrication. The assembly department allocates manufacturing overhead to jobs based on direct labor hours. The fabrication department allocates manufacturing overhead to jobs based on machine hours. Please use the following information about the Blue Company; Assembly Department Fabrication Department Total fixed manufacturing overhead cost estimated for all jobs during the whole year $480,000 $560,000 Estimated direct labor hours for...

  • You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactur...

    You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables...

  • Exercise 2-7 Job-Order Costing; Working Backwards [LO2-1, LO2-2, LO2-3] Hahn Company uses a job-order costing system....

    Exercise 2-7 Job-Order Costing; Working Backwards [LO2-1, LO2-2, LO2-3] Hahn Company uses a job-order costing system. Its plantwide predetermined overhead rate uses direct labor-hours as the allocation base. The company pays its direct laborers $15.50 per hour. During the year, the company started and completed only two jobs-Job Alpha, which used 64,400 direct labor-hours, and Job Omega. The job cost sheets for the these two jobs are shown below: Job Alpha Direct materials Direct labor Manufacturing overhead applied Total job...

  • Job-Order Costing U-Design-It Furniture Company uses a job-order cost system.   The company applies manufacturing overhead to...

    Job-Order Costing U-Design-It Furniture Company uses a job-order cost system.   The company applies manufacturing overhead to jobs using a predetermined overhead rate based on direct labor hours. The estimated MOH was $144,000 for the year and the estimated direct labor hours were 18,000 hours.   In March, Job #175 was completed.   Direct materials totaled $7,000. Total labor costs were $6,000 at $20 per hour. At the end of the year, it was determined that the company worked 17,000 direct labor hours...

  • Landen Corporation uses a job-order costing system. At the beginning of the year, the company made...

    Landen Corporation uses a job-order costing system. At the beginning of the year, the company made the following estimates: Direct labor-hours required to support estimated production 160,000 Machine-hours required to support estimated production 80,000 Fixed manufacturing overhead cost $ 480,000 Variable manufacturing overhead cost per direct labor-hour $ 5.00 Variable manufacturing overhead cost per machine-hour $ 10.00 During the year, Job 550 was started and completed. The following information is available with respect to this job: Direct materials $ 240...

  • 1. calculate plantwide predetermined overhead rate. 2. complete the job cost sheet for job alpha: Direct...

    1. calculate plantwide predetermined overhead rate. 2. complete the job cost sheet for job alpha: Direct materials Direct labor manufacturing overhead applied total job cost Hahn Company uses a job-order costing system. Its plantwide predetermined overhead rate uses direct labor-hours as the allocation base. The company pays its direct laborers $14.50 per hour. During the year, the company started and completed only two jobs-Job Alpha, which used 69.700 direct labor-hours, and Job Omega. The job cost sheets for the these...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT