  1. Standard Costing: Planned Variances

    As part of its cost control program, Tracer Company uses a standard costing system for all manufactured items. The standard cost for each item is established at the beginning of the fiscal year, and the standards are not revised until the beginning of the next fiscal year. Changes in costs, caused during the year by changes in direct materials or direct labor inputs or by changes in the manufacturing process, are recognized as they occur by the inclusion of planned variances in Tracer’s monthly operating budgets.

    The following direct labor standard was established for one of Tracer’s products, effective June 1, 2012, the beginning of the fiscal year:

    Assembler A labor (5 hrs. @ $10) $ 50
    Assembler B labor (3 hrs. @ $11) 33
    Machinist labor (2 hrs. @ $15) 30
    Standard cost per 100 units $113

    The standard was based on the direct labor being performed by a team consisting of five persons with Assembler A skills, three persons with Assembler B skills, and two persons with machinist skills; this team represents the most efficient use of the company’s skilled employees. The standard also assumed that the quality of direct materials that had been used in prior years would be available for the coming year.

    For the first seven months of the fiscal year, actual manufacturing costs at Tracer have been within the standards established. However, the company has received a significant increase in orders, and there is an insufficient number of skilled workers to meet the increased production. Therefore, beginning in January, the production teams will consist of eight persons with Assembler A skills, one person with Assembler B skills, and one person with machinist skills. The reorganized teams will work more slowly than the normal teams, and as a result, only 80 units will be produced in the same time period in which 100 units would normally be produced. Faulty work has never been a cause for units to be rejected in the final inspection process, and it is not expected to be a cause for rejection with the reorganized teams.

    Furthermore, Tracer has been notified by its direct materials supplier that lower-quality direct materials will be supplied beginning January 1. Normally, one unit of direct materials is required for each good unit produced, and no units are lost due to defective direct materials. Tracer estimates that 6 percent of the units manufactured after January 1 will be rejected in the final inspection process due to defective direct materials.

    Required:

    1. Determine the number of units of lower quality direct materials that Tracer Company must enter into production in order to produce 47,000 good finished units.
    units

    2. How many hours of each class of direct labor must be used to manufacture 47,000 good finished units?

    Assembler A hrs
    Assembler B hrs
    Machinist hrs

    3. Determine the amount that should be included in Tracer’s January operating budget for the planned direct labor variance caused by the reorganization of the direct labor teams and the lower quality direct materials. In your computations, carry the direct labor cost per unit to 3 decimal places. (CMA adapted)
    $

0 0
Add a comment Improve this question Transcribed image text
Answer #1
1 Determine the number of units of lower quality direct materials that Tracer Company must enter into production in order to produce 47,000 good finished units.
No of units required           47,000
Rejection @ 6% of items produced             3,000
Units to be produced before rejection           50,000
Unit of Raw Material required for production of one unit of Finished Goods 1
Total No of units of Raw Material required           50,000
2 How many hours of each class of direct labor must be used to manufacture 47,000 good finished units?
Particulars No of Labourers No of hours required now for 80 units No of hours required now for 50000 units
Assembler A labor 8 8             5,000
Assembler B labor 1 1                625
Machinist labor 1 1                625
Total Hours             6,250

Note:- In order to produce 47,000 units of correct finished goods, 50,000 units of initital goods have to be produced as 6% shall be rejection. Also it is assumed that 1 labour use ti put 1 hour and hence no of hours have been reorganised for each process

3 Determine the amount that should be included in Tracer’s January operating budget for the planned direct labor variance caused by the reorganization of the direct labor teams and the lower quality direct materials. In your computations, carry the direct labor cost per unit to 3 decimal places.
Budgeted ($113 per 100 units) Actual ($106 per 80 units for 50,000 Initial units produced)
Particulars No of Labourers No of hours Rate per hour Cost for 47,000 Finished Goods units No of Labourers No of hours Rate per hour Cost for 47,000 Finished Goods units Variation ($)
Assembler A labor 5 5 10 $23,500 8 8 10 $50,000 $26,500
Assembler B labor 3 3 11 $15,510 1 1 11 $6,875 ($8,635)
Machinist labor 2 2 15 $14,100 1 1 15 $9,375 ($4,725)
$53,110 $66,250 $13,140
Total Variation           13,140
No of Correct Finished goods produced           47,000
Labour cost variance ($/unit)             0.280
Add a comment
Know the answer?
Add Answer to:
Standard Costing: Planned Variances As part of its cost control program, Tracer Company uses a standard...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • STANDARD COSTING, PLANNED VARIANCES Bytown Container Company manufactures a plastic container. The following standards have been...

    STANDARD COSTING, PLANNED VARIANCES Bytown Container Company manufactures a plastic container. The following standards have been established for the container's materials and labour inputs:                                     Standard       Standard Price         Standard                                     Quantity         (rate in $)                   Cost ($) Direct materials        0.5 kg                          1                    0.50 Direct labour            0.1 hr.                        10                   1.00 During the first week of July, the company had the following results: Units produced                                  40,000 Actual labour costs                          $42,000 Actual labour hours                            4,100 Materials purchased and used       19,500 kg @ $1.05 per kg Other information: The purchasing agent located a new source of slightly higher quality plastic, and...

  • Standard Costing, Planned Variances Phono Company manufactures a plastic toy cell phone. The following standards have b...

    Standard Costing, Planned Variances Phono Company manufactures a plastic toy cell phone. The following standards have been established for the toy's materials and labor inputs: Standard Quantity Standard Price (rate in $) Standard Cost Direct materials 0.5 lb. $ 1.50 $0.75 Direct labor 0.15 hr. 10.00 1.50 During the first week of July, the company had the following results: Units produced 90,000 Actual labor costs $138,000 Actual labor hours 13,400 Materials purchased and used 44,250 lbs. @ $1.55 per lb...

  • 2. Compute the direct labor cost variance, including its rate and efficiency variances. Standard Cost Actual...

    2. Compute the direct labor cost variance, including its rate and efficiency variances. Standard Cost Actual Cost $ $ 0 0 0 0 3. Compute the overhead controllable and volume variances. Controllable Variance Actual overhead Budgeted overhead Controllable variance Fixed overhead volume variance Budgeted fixed overhead Fixed overhead cost applied Fixed overhead volume variance Check my work 1 ! Required information 12.5 [The following information applies to the questions displayed below.] points Trico Company set the following standard unit costs...

  • Petrillo Company produces engine parts for large motors. The company uses a standard cost system for...

    Petrillo Company produces engine parts for large motors. The company uses a standard cost system for production costing and control. The standard cost sheet for one of its higher-volume products (a valve) is as follows: Direct materials (7 lbs. @ $5.40) $37.80 Direct labor (1.75 hrs. @ $18) 31.50 Variable overhead (1.75 hrs. @ $4.00)   7.00 Fixed overhead (1.75 hrs. @ $3.00)   5.25     Standard unit cost $81.55 During the year, Petrillo experienced the following activity relative to the production of...

  • Materials and Labor Variances At the beginning of the year, Craig Company had the following standard...

    Materials and Labor Variances At the beginning of the year, Craig Company had the following standard cost sheet for one of its plastic products: Direct materials (5 lbs. @ $4.00) $20.00 Direct labor (2 hrs. @ $15.00) 30.00 Standard prime cost per unit $50.00 The actual results for the year are as follows: Units produced: 500,000. Materials purchased: 3,500,000 pounds @ $5.35. Materials used: 3,000,000 pounds. Direct labor: 950,000 hours @ $12.96. Required: 1. Compute price and usage variances for...

  • ABC Company uses a standard costing system for production costing and control Standard direct labor hours...

    ABC Company uses a standard costing system for production costing and control Standard direct labor hours based on practical capacity are used to compute overhead rates. The standard cost for the one of its products is as follows: Quantity Cost per unit Total Cost 4.0 kilograms $ 10.00 $ 40.00 2.6 hours 31.20 2.6 hours 10.00 26.00 2.6 hours 6.00 15.60 + Raw material Direct labor Variable overhead Fixed overhead 12.00 Annual practical capacity 60,000 units NU UN During the...

  • Variance Analysis in a Process-Costing Setting (Chapter 6 Required), Service Firm Aspen Medical Laboratory performs com...

    Variance Analysis in a Process-Costing Setting (Chapter 6 Required), Service Firm Aspen Medical Laboratory performs comprehensive blood tests for physicians and clinics throughout the Southwest. Aspen uses a standard process-costing system for its comprehensive blood work. Skilled technicians perform the blood tests. Because Aspen uses a standard costing system, equivalent units are calculated using the FIFO method. The standard cost sheet for the blood test follows (these standards were used throughout the calendar year): Direct materials (4 oz. @ $4.50)...

  • Nosemer Company produces engine part for large motors. The company uses a standard cost system for...

    Nosemer Company produces engine part for large motors. The company uses a standard cost system for production costing and control. The standard cost sheet for one of its higher volume products (a valve), is given below. Direct Materials 5 pounds at $4.00 $20.00 Direct Labor 1.4 hours at $10.50 $14.70 Variable overhead 1.4 hours at $6.00 $8.40 Fixed overhead 1.4 hours at $3.00 $4.20 Standard unit cost $47.30 During the year, Nosemer experienced the following activity relative to the production...

  • 1. Sana Rosa Furniture Company manufactures designer home furniture. Sana Rosa uses a standard cost system....

    1. Sana Rosa Furniture Company manufactures designer home furniture. Sana Rosa uses a standard cost system. The direct labor, direct materials, and factory overhead standards for an unfinished dining room table are as follows: Direct labor: standard rate $22.00 per hr. standard time per unit 3.00 hrs. Direct materials (oak): standard price $12.00 per bd. ft. standard quantity 17 bd. ft. Variable factory overhead: standard rate $3.20 per direct labor hr. Fixed factory overhead: standard rate $0.80 per direct labor...

  • At the beginning of the year, Craig Company had the following standard cost sheet for one of its plastic products: Direct materials (5 lbs. @ $4.00) $20.00 Direct labor (2 hrs. @ $15.00) 30.00 Standard prime cost per unit $50.00 The actual results for th

    At the beginning of the year, Craig Company had the following standard cost sheet for one of its plastic products:Direct materials (5 lbs. @ $4.00)$20.00Direct labor (2 hrs. @ $15.00)30.00Standard prime cost per unit$50.00The actual results for the year are as follows:Units produced: 400,000.Materials purchased: 2,060,000 pounds @ $3.95.Materials used: 2,100,000 pounds.Direct labor: 825,000 hours @ $14.85.Required:1.  Compute price and usage variances for materials. Enter amounts as positive numbers and select Favorable or Unfavorable.Material price variance$fill in the blank 1Favorable Material...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT