Question

13-5 Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a...

13-5

Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 32%. When last calculated, Waymouth’s MCE was 25%.

Key measures from the recent month’s production, averaged over all the jobs during that period, are as follows:

Activity Average Time (hours)
New product development 10.0
Materials handling 2.0
Order setup 1.0
Machine maintenance 1.5
Order scheduling 11.0
Inspection of completed order 3.5
Pack and move to storage or ship 1.0
Manufacturing assembly 4.0
Order taking and checking 0.5
Receiving and stocking raw materials 1.0
Inspection of raw materials at start of production 2.5

Required: Determine the manufacturing cycle efficiency (MCE) for the recent month. (Round your answer to 1 decimal place.)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

MCE = total processing time/total cycle time= 4/(4+2+1.0+1.5+11.0+3.5+1+1.0+2.5) = 4/27.5 = 14.5%

New product development time and order-taking time are not included in the manufacturing cycle and thus excluded from the cycle time efficiency calculation.

Add a comment
Know the answer?
Add Answer to:
13-5 Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety...

    Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 32%. When last calculated, Waymouth's MCE was 24% Key measures from the recent month's production,...

  • Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety...

    Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 37%. When last calculated, Waymouth's MCE was 32% Key measures from the recent month's production,...

  • Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety...

    Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth. which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 40%. When last calculated, Waymouth's MCE was 35%. Key measures from the recent month's production,...

  • Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety...

    Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 40%. When last calculated, Waymouth's MCE was 35%. Key measures from the recent month's production,...

  • Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety...

    Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cyde time is a critical success factor for Weymouth which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 37% When last calculated Waymouth's MCE was 32% Key measures from the recent month's production,...

  • Check my work Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant...

    Check my work Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 37%. When last calculated, Waymouth's MCE was 32% 0.31 points Key measures...

  • Determine the manufacturing cycle efficiency (MCE) for the recent month. Waymouth Manufacturing operates a contract manufacturing...

    Determine the manufacturing cycle efficiency (MCE) for the recent month. Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 37%. When last calculated, Waymouth's...

  • DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The...

    DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 1 2 3 4 Throughput time (days) ?...

  • DataSpan, Inc, automated its plant at the start of the current year and installed a flexible manufacturing system....

    DataSpan, Inc, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month 2 3 4 Throughput time (days) Delivery cycle...

  • MANAGERIAL ACCOUNTING CASE STUDY.CASE ASSIGNMENT #1: Cortland Manufacturing, Inc.

    MANAGERIAL ACCOUNTING CASE STUDY.CASE ASSIGNMENT #1: Cortland Manufacturing, Inc.We constantly seem to be pricing ourselves out of some markets and not charging enough in others. Our pricing policy is pretty simple: we mark up our full manufacturing cost by 50%. That means a computer that costs us $2,000 to manufacture will sell for $3,000. Until now I thought this was a workable approach, but now I’m not so sure.Steve Works, CEO, Cortland Manufacturing, Inc. (CMI)Steve’s Controller, Sally Nomer, had just...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT