Applying Overhead to Jobs, Costing Jobs
Jagjit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,800 and Job 94 with a beginning balance of $7,240. Jagjit applies overhead at the rate of $10 per direct labor hour. Direct labor wages average $16 per hour. Data on August costs for all jobs are as follows:
Job 93 | Job 94 | Job 95 | Job 96 | |
Direct materials | $930 | $4,520 | $3,400 | $1,260 |
Direct labor cost | 2,240 | 4,800 | 1,920 | 960 |
During August, Jobs 95 and 96 were started. Job 93 was completed on August 17, and the client was billed at cost plus 40%. All other jobs remained in process.
Required:
1. Calculate the number of direct labor hours that were worked on each job in August.
Job 93 | DLH |
Job 94 | DLH |
Job 95 | DLH |
Job 96 | DLH |
2. Calculate the overhead applied to each job during the month of August.
Job 93 | $ |
Job 94 | $ |
Job 95 | $ |
Job 96 | $ |
Feedback
1. For each job divide the labor cost by the labor rate.
2. Multiply the applied overhead rate by the labor hours for each job.
3. Prepare job-order cost sheets for each job as of the end of August. All amount cells must have an entry; enter zeros as needed.
Jagjit Company | ||||
Job-Order Cost Sheets | ||||
August 31 | ||||
Job 93 | Job 94 | Job 95 | Job 96 | |
Beginning balance | $ | $ | $ | $ |
Direct materials | ||||
Direct labor | ||||
Applied overhead | ||||
Total | $ | $ | $ | $ |
Feedback
Incorrect
4. Calculate the balance in Work in Process on
August 31.
The work in process balance on August 31 is $.
5. What is the price of Job 93?
The price of Job 93 is $.
6. CONCEPTUAL CONNECTION: Part way through the year, Jagjit bought a bulldozer to handle larger jobs. The bulldozer cost $38,500 and is needed for larger commercial jobs. Smaller residential jobs can still be done with the smaller bobcat tractor.
Complete the statement below that outlines how the bulldozer’s cost could be applied to only those jobs that need the larger equipment.
Create a separate department for the acquisition and use of the bulldozer. Treat the bulldozer’s depreciation, fuel, maintenance, etc. as total budgeted cost . Divide this by the anticipated annual hours of use to arrive at the overhead rate .
The answer has been presented in the supporting sheet. First 4 parts has been solved with detailed explanation and calculation. For detailed answer refer to the supporting sheet.
Applying Overhead to Jobs, Costing Jobs Jagjit Company designs and builds retaining walls for individual customers....
Jagjit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,770, and Job 94 with a beginning balance of $7,300. Jagjit applies overhead at the rate of $10 per direct labor hour. Direct labor wages average $17 per hour. Data on August costs for all jobs are as follows: Job 93 Job 94 Job 95 Job 96 Direct materials $990 $4,530 $3,300 $1,280 Direct...
Instructions Amount Descriptions Starting Questions Job-Order Cost Sheets Concluding Questions Instructions Jagit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,770, and Job 94 with a beginning balance of 57,300 Jagjit apples overhead at the rate of $10 per direct labor hour. Direct labor wages average $17 per hour. Data on August costs for all jobs are as follows: Job 93 Job 94...
please help, cant figure out the wrong ones. thank you so much Applying Overhead to Jobs, Costing Jobs Jagjit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,750 and Job 94 with a beginning balance of $7,300. Jagjit applies overhead at the rate of $8 per direct labor hour. Direct labor wages average $18 per hour. Data on August costs for all jobs...
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $11 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 40% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Applying Overhead to Jobs, Costing Jobs Gorman Company builds internal conveyor equipment to client specifications On October 1, Job 877 was in process with a cost of $18.730 to date. During October, Jobs 878,879, and 880 were started Data on costs added during October for all jobs are as follows: Job 877 Job 878 Job 879 Job 880 Direct materials $14,550 $6,070 $3,580 $1,380 Direct labor 14.2008,600 1,900 Overhead is applied to production at the rate of 75% of direct...