A company would like to determine the best production schedule using a manufacturing process with four...

A company would like to determine the best production schedule using a
manufacturing process with four machines: W, X, Y, and Z.
Each machine can be used for 2400 minutes per week.

The weekly demands and the processing time on machines are shown below.
Product A, 150 units/week, 6, 10, 6, 0 minutes;
Product B, 90 units/week, 0, 9, 7, 8 minutes;
Product C, 120 units/week, 8, 8, 7, 5 minutes;
Product D, 130 units/week, 7, 0, 5, 8 minutes.

The above table shows that product A needs 6 minutes on machine W,
10 minutes on machine X, 6 minutes on machine Y, and 0 minute on
machine Z.

The production manager has decided to manufacture product D first,
product A second, product B third, and product C last.

Determine how many units can be manufactured for each product given
the manager's decision.

Show brief calculation and explanation.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer Is Well Explained In The AttachmentAnsworo Given, (Minutes) Mac-z for I product Mac- w Mac-x | Mac-y 3rd Prod - B Prod c lo no ho Prod -D Calcun of No: g unitsBalance 590 90 90 220 220 product- 88 (Demand -120. 88 640 55 (1185) 77 (Il vuits x8) (llots x8) (11x7) Vuits) Rut production

Add a comment
Know the answer?
Add Answer to:
A company would like to determine the best production schedule using a manufacturing process with four...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The...

    2. King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, 560 for Product X, $90 for Product Y and S100 for Product Z. Fixed overhead is estimated at S5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4, Each of the machines is available for 40 hours a week and there is no setup time required when...

  • A company makes two products (X and Y) using two machines (A and B). Each unit...

    A company makes two products (X and Y) using two machines (A and B). Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes processing time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes processing time on machine B. At the start of the current week there are 30 units of X and 90 units of Y in stock....

  • A company makes four products: Product A sells for $50 but needs $10 of materials; Product...

    A company makes four products: Product A sells for $50 but needs $10 of materials; Product B sells for $75 but needs $30 of materials; Product C sells for $100 but needs $50 of materials; Product D sells for $150 but needs $75 of materials. The labor cost is $15/hr. The processing requirements for each product on each of the four machines are shown in the table. Table 6 Work Center Processing Time (min/unit) A B C D W 3...

  • A company manufactures four products (1,2,3,4) on two machines (X and Y). The time (in minutes)...

    A company manufactures four products (1,2,3,4) on two machines (X and Y). The time (in minutes) to process one unit of each product on each machine is shown below:, Product 1 in X = 10 min , in Y= 27 min Product 2 in X = 12 min , in Y =19 min Product 3 in X =13 min,in Y =33 min Product 4 in X = 8 min,in Y =23 min The profit per unit for each product (1,2,3,4)...

  • Determine the best mix of R and S S US $95 130/week US $ 105 130/week A 7 min 3 min min 3.5 min C 8 min A 1.5 min 6 min...

    Determine the best mix of R and S S US $95 130/week US $ 105 130/week A 7 min 3 min min 3.5 min C 8 min A 1.5 min 6 min C 2 min 6 min 2 min RMI RM2 RM3 RM4 US $20 US $3 US $22 US $20 OE 12,000/week = Time available= 2400 minutes Determine the best mix of R and S S US $95 130/week US $ 105 130/week A 7 min 3 min min...

  • Part I A full shift of production was scheduled to run on machine X. Production was stopped for 2...

    just #3 Part I A full shift of production was scheduled to run on machine X. Production was stopped for 20 minutes due to a machine failure, 10 minutes for a bin change, 30 minutes for a quality concern requiring a tool repair. Assumptions: A) A day- 8 hours with 20 minutes break time B) A total of 1200 parts is processed per day and only 6 is rejected/scraped C)- The ideal cycle time established by engineering or the equipment...

  • G J Problem 12 - TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. -$3000 D = 100/WK...

    G J Problem 12 - TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. -$3000 D = 100/WK Machine 1 => 1 Set-Up 240 minutes PRODUCT Y S.P. - $2000 D - 200/WK Machine 2 => 1 Set-Up 30 minutes ASSEMBLY 10 minutes/unit ASSEMBLY 5 minutes/unit Machine 3 ==> 1 Set-up 90 minutes MACHINE 3 22 minutes/unit MACHINE 4 10 minutes/unit MACHINE 2 3 minutes/unit Machine 4 => 1 Set-up 60 minutes MACHINE 1 7 minutes/unit MACHINE 2 5 minutes/unit MACHINE 1...

  • Omar Manufacturin production facilities. Cost data on the three Costs Direct Materials costs Labor costs Variable...

    Omar Manufacturin production facilities. Cost data on the three Costs Direct Materials costs Labor costs Variable overhead costs ns three products all of which products are as folows Product (A) Produet (B) Produet OD 13.3 Traceable fixed overhead costs JOD 2.5 JOD 19 JOD 8 S JOD 733 JOD 66 Unit product cost JOD 60.5 Omar Company makes the three products in a single facility. Additional data concerning these products are listed below Product AProduct (B) Product (C) JOD 87.90...

  • The senior management at Davis Watercraft would like to determine if it is possible to improve...

    The senior management at Davis Watercraft would like to determine if it is possible to improve firm profitability by changing their existing product mix. Currently, the product mix is determined by giving resource priority to the highest contribution margin watercrafts. Davis Watercraft always has a contingent of 10 workers on hand; each worker is paid $28 per hour. Overhead costs are $12,000 per week. The plant operates 18 hours per day and 6 days per week. Labor is considered a...

  • Problem 12 TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. = $3000 D= 100/WK PRODUCT Y S.P....

    Problem 12 TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. = $3000 D= 100/WK PRODUCT Y S.P. = $2000 D= 200/WK Machine 1 ==> 1 Set-Up 240 minutes Machine 2 ==> 1 Set-Up 30 minutes ASSEMBLY 10 minutes/unit ASSEMBLY 5 minutes/unit Machine 3 ==> 1 Set-up 90 minutes MACHINE 3 22 minutes/unit MACHINE 4 10 minutes/unit MACHINE 2 3 minutes/unit Machine 4 ==> 1 Set-up 60 minutes MACHINE 1 7 minutes/unit MACHINE 2 5 minutes/unit MACHINE 1 8 minutes/unit Assembly ==>...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT