Question

Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for oneRequired: 1. Calculate the total time it takes to produce a batch of 20 units using the traditional departmental manufacturin

0 0
Add a comment Improve this question Transcribed image text
Answer #1

(in minutes) Departmental Continuous Flow S.no 10 Answer-3) Casting reduced to 9 minutes total time taken per product also re

Add a comment
Know the answer?
Add Answer to:
Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of...

    Continuous Flow vs. Departmental Manufacturing Gumbrecht Company has the following departmental manufacturing layout for one of its plants: 12 minutes 6 minutes Wait time - 10 minutes Move and wait time - 15 minutes Casting Grinding Move and wait time - 25 minutes 10 minutes 2 minutes Move and wait time - 20 minutes Drilling Finishing A consulting firm has recommended a value stream with the following manufacturing cell: 6 minutes 12 minutes Grinding Casting Drilling Finishing 10 minutes 2...

  • Dunder Mifflin Company has the following departmental manufacturing layout for one of its plants: Wait time...

    Dunder Mifflin Company has the following departmental manufacturing layout for one of its plants: Wait time – 10 minutes ------ Casting 12minutes Move and wait time – 15 minutes -------Grinding 6 minutes Move and wait time – 25 minutes ------- Drilling 10 minutes Move and wait time – 20 minutes -------Finishing 2 minutes A consulting firm has recommended a value stream with the following manufacturing cell: Casting 12 minutes ---- Grinding 6 minutes -----Drilling 10 minutes ----- Finishing 2 minutes...

  • Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15...

    Anderson Company has the following departmental manufacturing structure for one of its products: 7.5 minutes 15 minutes Wait time = 15 min. Move and wait time = 18 min. Molding Welding Move and wait time = 22.5 min. 12 minutes 7 minutes Move and wait time = 19.5 min. Polishing Assembly After some study, the production manager of Anderson recommended the following revised cellular manufacturing approach: 15 minutes 7.5 minutes Welding Molding Polishing Assembly 12 minutes 10.5 minutes Required: 1....

  • Cycle Time and Velocity, MCE Computador has a manufacturing plant in Des Moines that has the...

    Cycle Time and Velocity, MCE Computador has a manufacturing plant in Des Moines that has the theoretical capability to produce 243,000 laptops per quarter but currently produces 91,125 units. The conversion cost per quarter is $7,290,000. There are 60,750 production hours available within the plant per quarter. In addition to the processing minutes per unit used, the production of the laptops uses 10 minutes of move time, 10 minutes of wait time, and 10 minutes of rework time. (All work...

  • Question 1 (a) Callum's Castings is a small company producing high quality bronze figurines. The company's...

    Question 1 (a) Callum's Castings is a small company producing high quality bronze figurines. The company's next project is to produce a range of up to three types of military figurines: the Hussar, the Fusilier and the Piper. To produce each figurine it has to go through three processes: casting, grinding and finishing. Each Hussar requires 400g of bronze, three hours for casting, 40 minutes for grinding and 40 minutes for finishing; each Fusilier requires 250g of bronze, two hours...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 64 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 4 minutes Process Step 4 9 minutes The time required to move each batch between steps is 14 minutes. In addition, the time to move raw materials to Process Step...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 61 units. The process time for each step is as follows: Process Step 1 6 minutes Process Step 2 8 minutes Process Step 3 5 minutes Process Step 4 4 minutes The time required to move each batch between steps is 15 minutes. In addition, the time to move raw materials to Process Step...

  • Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing...

    Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in f...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials to Process Step...

  • Lead Time Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process includes stamping, final...

    Lead Time Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process includes stamping, final assembly, testing, and shipping. In the stamping operation, a number of individuals are responsible for stamping the steel outer surface of the appliance. The stamping operation is set up prior to each run. A run of 40 stampings is completed after each setup. A setup requires 60 minutes. The parts wait for the setup to be completed before stamping begins. Each stamping requires 5...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT