Question

Question 2 The soil profile at a level site consists of a 3-m thick layer of sandy clay, overlaying an 8-m thick layer of loo

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer 18Km Sardy clay Em oose Sand. tom m2 20m Stand pipe To Qetater level m tee pizometer guate level hess = o guould eteci

3M mM T 7m at at ouggume Same Ko at a aPa K, Sh KoSh 8h at , P +9.81x = 27-81 kN at c 32.1u5 KN

Add a comment
Know the answer?
Add Answer to:
Question 2 The soil profile at a level site consists of a 3-m thick layer of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The water table is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m3 and a saturated unit weight of 18 kN/m3. The capillary rise in the sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m3....

  • geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick,...

    geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick, sandwich between two sand layers. The top sand layer has a density of 1.9 Mg/m² and is 5 m thick. Below this layer is a 10 m thick clay layer with a saturated density of 1.8 Mg/m' and a saturated water content 42%. The deeper sand layer has a saturated density of 1.9 Mg/m² and extend to the depth investigated at the site. The...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The watertable is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m and a saturated unit weight of 18 kN/m3. The capillary rise in sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m 1. One...

  • Example 2:3 The soil profile at a site consists of a 3 m thick sand layer...

    Example 2:3 The soil profile at a site consists of a 3 m thick sand layer (Ybulk -16.5 kN/m3 sat18.5 kN/m3) underlain by a 6 m thick clay layer (w-27%, Gs-270, m,-0.31 MPa", cv-2.6 m2/year), which is underlain by a gravel layer. A 3 m compacted fill with a unit weight of 20 kN/m3 is to be placed at ground level. a. What would be the final consolidation settlement? b. How long will it take for 50 mm of consolidation...

  • 1. (25 points) The soil profile at a site consists of a layer of fine sand...

    1. (25 points) The soil profile at a site consists of a layer of fine sand 5 m thick above a layer of clay 4 m thick. Below the clay is a layer of impermeable rock. The groundwater table was observed at 2 m below ground level. The unit weight of the sand above and below the water table is 20 KN/m'. The water content of the clay is 25% and its dry unit weight is 15 KN/m'. The compression...

  • Problem 7 The soil profile at a site consists of a top 4 m layer of...

    Problem 7 The soil profile at a site consists of a top 4 m layer of dense sand followed by 2 m of clay, which is underlain by a stiff stratum. The water table is at 2 m below the ground level. The following data was obtained from a consolidation test on an undisturbed sample obtained from the middle of the clay layer: water content 5 36%, specific gravity of the clay grains = 2.72, compression index = 0.72, recompression...

  • 3) At a construction site, a site investigation has been carried out. At ground level (-1...

    3) At a construction site, a site investigation has been carried out. At ground level (-1 m NAP) a clay layer with a thickness of 4 m is found (y = 16 kN/m”, k = 2.0x10-12 m/s, Cp = 15), followed by a sand layer of 6 m thickness (y = 20 kN/m², k = 5.0x10-7 m/s), another clay layer of 4m thickness (y = 18 kN/m3, k = 4.5x10-11 m/s, Cp = 25), and finally another sand layer (y...

  • 2.) THE SOIL PROFILE SHOWS CONSISTS OF A LAYER OF DRY SAND 4m HICK WHICH OVERLIES...

    2.) THE SOIL PROFILE SHOWS CONSISTS OF A LAYER OF DRY SAND 4m HICK WHICH OVERLIES A LAYER OF CLAY HAVING A THICKNESS OF 6m. GROUND WATER TABLE IS LOCATED AT THE INTERFACE OF THE SAND AND CLAY a.) COMPUTE THE EFFECTIVE STRESS AT THE BOTTOM OF THE CLAY LAYER b..) IF THE WATER TABLE RISES BY 2m, DETERMINE THE EFFECTIVE STRESS AT THE BOTTOM OF THE CLAY LAYER c.) IF THE WATER TABLE LOWERS BY 2m, DETERMINE THE EFFECTIVE...

  • [Problems 1-4] The soil profile at a site for a proposed office building consists of a...

    [Problems 1-4] The soil profile at a site for a proposed office building consists of a layer of fine sand 10.4 m thick above a layer of soft, normally consolidated clay 2 m thick. Below the soft clay is a deposit of coarse sand. The groundwater table was observed at 3 m below ground level. The void ratio of the sand is 0.76, and the water content of the clay is 43%. The building will impose a vertical stress increase...

  • 1. An 8-m thick normally consolidated clay layer is doubly drained as shown below. (This means...

    1. An 8-m thick normally consolidated clay layer is doubly drained as shown below. (This means that a very pervious layer compared to the clay exists on top of and under the clay layer) The embankment applied an average vertical stress increase of 100 kPa to the clay layer. The water table is located at the mid depth of the sand layer. Assume the sand above the water table is dry 0 Pore water pressure, u (kPa) 20 40 60...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT