Answer #1

Normal Time = Performance Rating * Observation Time

Since observation time is less than the normal time, hence to equate the both performance rating will be greater than 1.

Hence, Correct option will be D. greater than 1.0 (100%).

Add a comment
Know the answer?
Add Answer to:
In a time study, if the analyst determines that a worker under observation is working at...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A time study analyst observes a worker over a period of time and calculates that the worker requi...

    A time study analyst observes a worker over a period of time and calculates that the worker required 60.0 minutes per unit produced. The worker was rated by the analyst at a 120 percent performance rating, and an 15 percent allowance for personal time and fatigue applies. (1) What is the standard time for this task? (2) If a worker managed to produce 10 units in an eight-hour day, what would their day's pay be if the base rate is...

  • A methods and measurement analyst wants to develop a time standard for a certain task. In...

    A methods and measurement analyst wants to develop a time standard for a certain task. In a preliminary study, he observed one worker perform the task six times with an average observed time of 20 seconds and a standard deviation of 2.6 seconds What is the standard time for this task if the employee worked at a 27.4 percent slower pace than average, and an allowance of 35.0 percent of job time is used? (Keep one decimal place in your...

  • (20 points) A direct time study is performed to obtain average time and performance rating values...

    (20 points) A direct time study is performed to obtain average time and performance rating values for the work elements in a certain repetitive task. The values are given in the table below. Elements a, b, and c are worker-controlled. Element d is a machine-controlled element and its time is the same each cycle (N.A.means performance rating is not applicable). Element c is performed while the machine is performing its cycle (element d). Element e is a worker- controlled irregular...

  • A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy ...

    A: Find the Normal Time for the "Prepare Daily Reports" operation: B: Normal Time for "Photocopy Results" Operation: C: Normal TIme for the "Label and Package Reports Operation: D: Normal Time for "Distribution Reports" Operation: E: Normal Time for the ENTIRE OPERATION PROCESS F: The Standard Time for this Process: G: The number of Operations that are required for a 90, 95, and 99% confidence level with 5% accuracy? Based on a careful work study in the Hofstetter Corp., the...

  • What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that ...

    What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...

  • Based on a careful work study in the Hofstetter? Corp., the results shown in the following...

    Based on a careful work study in the Hofstetter? Corp., the results shown in the following table have been? observed: a) The normal time for the "prepare daily reports" operation = ___ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = ___ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = ___ minutes (round your response to two decimal places). The normal...

  • ociation bet i Data Table pretation of is as neede Student Study Time GPA on error....

    ociation bet i Data Table pretation of is as neede Student Study Time GPA on error. Skipped predict yig WN- QONOMN- nt of variabili GPA. % 00 O Print Done b. Find and interpret r. Use the interpretation of that refers to the prediction error and the percent of variability explained. 7- (Round to two decimal places as needed) 0 Interpret r in terms of the prediction error The overal prediction error using to predicty is than the prediction error...

  • a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response...

    a) The normal time for the "prepare daily reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "photocopy results" operation = __________ minutes (round your response to two decimal places). The normal time for the "label and package reports" operation = _________ minutes (round your response to two decimal places). The normal time for the "distribute reports" operation = _________ minutes (round your response to two decimal places). The normal time for...

  • Your first assignment in your new position as assistant financial analyst at Caledonia Products is to...

    Your first assignment in your new position as assistant financial analyst at Caledonia Products is to evaluate two new​ capital-budgeting proposals. Because this is your first​ assignment, you have been asked not only to provide a recommendation but also to respond to a number of questions aimed at assessing your understanding of the​ capital-budgeting process. This is a standard procedure for all new financial analysts at​ Caledonia, and it will serve to determine whether you are moved directly into the​...

  • Hello, I created this question myself and was able to use the excel OM software for...

    Hello, I created this question myself and was able to use the excel OM software for the answer. I was wondering if you could help me translate the information. what does this all mean? The question is in the upper right hand corner. Thanks in advance. AutoSave Group Project7.9.20 Kimberly Smith KE ER de Home Insert Page Layout Formulas Data Review Help Comments casti General 28 O 09- Α' Α' Wrap Test A-EE. Merge Center - BTW BE- Weas Sort...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT