Question
please answer this
ABCs machine shop is considering the use of priority scheduling rule in the fabrication shop and must decide whether to use:
0 0
Add a comment Improve this question Transcribed image text
Answer #1

order NO Page 1 Total Remaining Time Remaining Manufacturing until Due time (days) Date current operation processing time 00Page 2 smallest CR comes ist so sequence will be A → →D → B C © Earliest Due date (EPD) • Sequencing will be based on earliesPage 3 @ order slack = Time remaining for Due date - Processing time 0.5 For Order A - 12 - 8 = 4 OS For Order B= 15-5 = 10 o

Add a comment
Know the answer?
Add Answer to:
please answer this ABC's machine shop is considering the use of priority scheduling rule in the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • HOW IS THE PRIORITY SCHEDULING DONE IN FOLLOWING QUESTION? GIVE DETAIL EXPLANATION OF ANSWERS. ALL STEPS INVOLVED.

    The Ace Machine Company is considering using a priority scheduling rule in its fabrication shop and must decide whether to use: the critical rule, the order slack rule, the shortest operation next rule or the slack per operation rule. The table below shows the company’s current inventory and shop status. Exhibit 1 Order numberManufacturing Lead TimeRemainingTime   Remaining Until Due DateCurrent OperationProcessing TimeNumber   of OperationsRemainingTotal   Processing Time Remaining115723821511348320-2528415-543851531128Note: Time is measured in days. Manufacturing lead time remaining includes both the machine...

  • decimal places). An Alabama lumberyard has four jobs on order, as shown in the following table....

    decimal places). An Alabama lumberyard has four jobs on order, as shown in the following table. Jobs are logged as they arrive. Today is day 1 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: % (enter your response as a percentage The percentage utilization for the sequence developed using the EDD rule = rounded to two decimal places). Job Work (Processing) Time (Days) Job Due Date (Days) d)...

  • a) Using the EDD (earliest due date) decision rule for sequencing the jobs, the order is...

    a) Using the EDD (earliest due date) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): At Morgan's Transformer Rebuilding, following jobs (below) are ready for dispatching to a work center. The processing times, date job received, and due dates for the jobs are given below. In what sequence would the jobs be ranked according to the decision rules on the left Sequence Job 1 Date Job...

  • Question 20, Math problem 20. The Mowry Machine Shop still has five jobs to be pro-...

    Question 20, Math problem 20. The Mowry Machine Shop still has five jobs to be pro- cessed as of 8 A.M. today (day 23) at its bottleneck opera- tion. The day when the order arrived, processing time, and promised due dates are given in the following table. The jobs are listed in the order of arrival. Time Since Order Arrived (days ago) Processing Time (days) Due Date (days from now) Job А 11 10 22 10 8 В 13 8...

  • ABC Enterprises has five jobs that must be scheduled for production at a work center. Below...

    ABC Enterprises has five jobs that must be scheduled for production at a work center. Below are the processing times and due dates for each job.                                     Job Processing Time (in days) Due Date (days from today) 1 7 14 2 5 21 3 3 10 4 2 7 5 6 9                                                                                                                            Schedule the jobs by sequencing them using the Earliest Due Date (EDD) priority rule. What is the average flow time? Show your Work and round your...

  • a) Using the EDD (earliest due date) decision rule for sequencing the jobs, the order is...

    a) Using the EDD (earliest due date) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): At Morgan's Transformer Rebuilding, following jobs (below) are ready for dispatching to a work center. The processing times, date job received, and due dates for the jobs are given below. In what sequence would the jobs be ranked according to the decision rules on the left Sequence Job 1 Date Job...

  • Determine the processing sequence that would result using the Slack per operation rule. Given the information...

    Determine the processing sequence that would result using the Slack per operation rule. Given the information in the following table Remaining Number of Job Time (Days) Due Date Operations Remaining Processing 8 6 10 12 10 8 Determine the processing sequence that would result using the Slack per operation rule. The sequence is (Click to select) v

  • please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six...

    please explain every step Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: Job Job Operation 1 (hours) 10 Operation 2 (hours) H TO For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) =1 hours (enter your response as a...

  • Given the following set of jobs waiting to run on a machine, use the Slack (least...

    Given the following set of jobs waiting to run on a machine, use the Slack (least slack time remaining) dispatching rule to sequence the jobs. Job Days Until Due Date Processing Time A 35 30 B 27 17 C 33 30 D 41 25 A. A,B,C,D B. B,C,D,A C. C,A,B,D D. B,C,A,D E. none of the above

  • 3. [Challenging Question - Scheduling for Rescuing Scuba Divers (20 pts)] Tom Cruise has worked as...

    3. [Challenging Question - Scheduling for Rescuing Scuba Divers (20 pts)] Tom Cruise has worked as an operations manager of Underwater Treasure Discovery Company in Miami, FL and recently he was assigned to make a schedule to dispatch deep-water robots to save five scuba divers needing urgent rescue out of danger under the deep sea. He must do a very brief assessment of how urgent each diver appears and need to determine the best sequence to save all five scuba...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT